Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening And Strengthening Of Modha Chauraha To Moushiwala Road In Two Lane With Paved Shoulder Including Five Years Maintenance In District Ayodhya
|
| Description |
Widening And Strengthening Of Modha Chauraha To Moushiwala Road In Two Lane With Paved Shoulder Including Five Years Maintenance In District Ayodhya
|
| Organisation | Chief Engineer PWD Faizabad Zone | State Govt. and UT |
| Tender Id | 2025_CEUFZ_996389_1 |
|
Reference Number |
98/2kam ayo-ambe-circle/25 dt. 04.01.2025 |
| Tender Fee | 2714 |
| EMD | 26 Lakh |
| Tender Value | |
| Place | office of the se.ayo.ambe.circle.pwd.ayodhya |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1766623 |
| Start Date | January 22, 2025 18:30 |
| End Date |
Expired
10/02/2025
Expired 509 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreWidening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Construction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Read moreStrengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp
Strengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp
Read moreIn the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
Read moreCharter hire of 2 two nos of dp 3 drillship modu package with equipment and crew for drilling, testing and abandonment of exploratory wells in water depths from 500 meters to 3000 meters.
Charter hire of 2 two nos of dp 3 drillship modu package with equipment and crew for drilling, testing and abandonment of exploratory wells in water depths from 500 meters to 3000 meters.
Read moreAnnual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Annual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreof your Industry type