Tender Details
Particulars | Details |
---|---|
Title |
Improvement Of Gaurkheda Markanda Wathoda Shukleshwar Road Vr. 8 Ch. 0/00 To 1/00 4/00 To 5/00 Tq. Daryapur
|
Description |
Improvement Of Gaurkheda Markanda Wathoda Shukleshwar Road Vr. 8 Ch. 0/00 To 1/00 4/00 To 5/00 Tq. Daryapur
|
Organisation | Government of Maharashtra |
Tender Id | 2023_AMRAV_939344_42 |
Reference Number |
NO/E-TENDER/ ZP/WD/AMT/NIT10/2023-24 |
Tender Fee | 1120 |
EMD | 0 |
Tender Value | |
Place | ZP OFFICE AMRAVATI |
Link | https://mahatenders.gov.in |
Start Date | September 04, 2023 23:30 |
End Date |
05/09/2023 ( Expired 625 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Read moreReconstruction of rcc bridge of 5 span of 8 mtr each on ajnala chogawan road to poonga road at rd 6000 (under pmgsy-iii, batch-i) year 2024-25, distt. amritsar. package no. pb01164a
Reconstruction of rcc bridge of 5 span of 8 mtr each on ajnala chogawan road to poonga road at rd 6000 (under pmgsy-iii, batch-i) year 2024-25, distt. amritsar. package no. pb01164a
Read morePreparation of detailed project report (dpr) for implementation of a 4/6/8- lane access - controlled semi ring road through vcf from bhogapuram to rambilli
Preparation of detailed project report (dpr) for implementation of a 4/6/8- lane access - controlled semi ring road through vcf from bhogapuram to rambilli
Read moreImprovement and maintainance of nh-61 to purna aabadi kanadkheda vr-36 road.0/00 to 3/250 tq. purna and dist. parbhani.
Improvement and maintainance of nh-61 to purna aabadi kanadkheda vr-36 road.0/00 to 3/250 tq. purna and dist. parbhani.
Read moreConstruction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Read moreConstruction of bituminous layer over pcc road from phase 3 e1 to phase 4 a-1-1 balidih industrial area jiada.
Construction of bituminous layer over pcc road from phase 3 e1 to phase 4 a-1-1 balidih industrial area jiada.
Read morePr of road from pecharthal laljuri road to shantinagar awc l 0 900 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00km to ch 0 90 km
Pr of road from pecharthal laljuri road to shantinagar awc l 0 900 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00km to ch 0 90 km
Read morePr of road from machmara kumarghat kn road to laxmipur pmgsy road via shilpara during the year 2025 2026 total length 0 900 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 km
Pr of road from machmara kumarghat kn road to laxmipur pmgsy road via shilpara during the year 2025 2026 total length 0 900 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 km
Read morePr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Read moreof your Industry type