Tender Details

Particulars Details
Title
Improvement Of Gaurkheda Markanda Wathoda Shukleshwar Road Vr. 8 Ch. 0/00 To 1/00 4/00 To 5/00 Tq. Daryapur
Description
Improvement Of Gaurkheda Markanda Wathoda Shukleshwar Road Vr. 8 Ch. 0/00 To 1/00 4/00 To 5/00 Tq. Daryapur
Organisation Government of Maharashtra
Tender Id 2023_AMRAV_939344_42
Reference
Number
NO/E-TENDER/ ZP/WD/AMT/NIT10/2023-24
Tender Fee 1120
EMD 0
Tender Value
Place ZP OFFICE AMRAVATI
Link https://mahatenders.gov.in
Start Date September 04, 2023 23:30
End Date

05/09/2023 ( Expired 625 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.

Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.

Read more
Reconstruction of rcc bridge of 5 span of 8 mtr each on ajnala chogawan road to poonga road at rd 6000 (under pmgsy-iii, batch-i) year 2024-25, distt. amritsar. package no. pb01164a

Reconstruction of rcc bridge of 5 span of 8 mtr each on ajnala chogawan road to poonga road at rd 6000 (under pmgsy-iii, batch-i) year 2024-25, distt. amritsar. package no. pb01164a

Read more
Preparation of detailed project report (dpr) for implementation of a 4/6/8- lane access - controlled semi ring road through vcf from bhogapuram to rambilli

Preparation of detailed project report (dpr) for implementation of a 4/6/8- lane access - controlled semi ring road through vcf from bhogapuram to rambilli

Read more
Improvement and maintainance of nh-61 to purna aabadi kanadkheda vr-36 road.0/00 to 3/250 tq. purna and dist. parbhani.

Improvement and maintainance of nh-61 to purna aabadi kanadkheda vr-36 road.0/00 to 3/250 tq. purna and dist. parbhani.

Read more
Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode

Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode

Read more
Construction of bituminous layer over pcc road from phase 3 e1 to phase 4 a-1-1 balidih industrial area jiada.

Construction of bituminous layer over pcc road from phase 3 e1 to phase 4 a-1-1 balidih industrial area jiada.

Read more
Pr of road from pecharthal laljuri road to shantinagar awc l 0 900 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00km to ch 0 90 km

Pr of road from pecharthal laljuri road to shantinagar awc l 0 900 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00km to ch 0 90 km

Read more
Pr of road from machmara kumarghat kn road to laxmipur pmgsy road via shilpara during the year 2025 2026 total length 0 900 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 km

Pr of road from machmara kumarghat kn road to laxmipur pmgsy road via shilpara during the year 2025 2026 total length 0 900 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 km

Read more
Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km

Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise