Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bengaluru Dharmavaram Section: Construction Of Precast Rcc Drain In Between Tracks For 4.5 Kms At Isolated Locations Between 128/700 134/700 Between Rangepalli (Repi) Penukonda (Pkd) In Sse/Pway/Pkd Section. Maintenance Period Is 6 Months
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 83933134 |
|
Reference Number |
20SBC25OF03-09-25ITEM-03 |
| Tender Fee | 0 |
| EMD | 2.87 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102025/83933134/viewNitPdf_5091036.pdf |
| Start Date | September 03, 2025 19:20 |
| End Date |
Expired
06/10/2025
Expired 372 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bengaluru - dharmavaram section : construction of rcc drain for 4.5 kms at isolated locations between km 128/700-134/700 between rangepalli (repi) - penukonda (pkd) in sse/pway/pkd section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreAden/hindupur : zone i : annual repairs/maintenance of quarters and service buildings under the jurisdiction of dharmavaram (dmm) [excl] - penukonda (pkd) via satya sai prashanthi nilayam (sspn) and between penukonda (pkd) - dharmavaram (dmm) via makajapalli (mkj).
For complete deion and other details, please refer to tender
Read moreSw i: penukonda - dharmavaram section: complete track renewal (primary) for a length of 0.6 kms from 0/000 to 0/600 at penukonda yard road - 1 (sspn line) and through turnout renewal (primary) of point number - 62a at pkd yard between km 0/180-0/240 (1 set) in sse/pway/pkd section. sw ii : bengaluru - dharmavaram section : through fittings renewal for a length of 15.4 km from km 56/700 to 72/100 dn line in sse/pway/hup section. sw iii : yelahanka - chintamani section : replacement of over aged
For complete deion and other details, please refer to tender
Read moreAden dindigul sub division:- : proposed standardization of formation at isolated locations between km:95/000-96/700 and 30/750 to 32/500 in sse/p.way/palani section..
For complete deion and other details, please refer to tender
Read moreMsb-vm section -essential urgent p.way works in sse/pway/ms & tbm sections to eliminate deficiencies and removal of vegetation, jungles & bushes alongside the track and in between tracks between in aden/tbm sub-division for a period of one year.
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreSalem - bengaluru section : slope stabilization by wire netting of slopes in cuttings from km 48/600-700, 49/000-100 between toppur (tpp) and muttampatti (mpc) stations in sse/pway/dharmapuri (south) section. maintenance period is 12 months
For complete deion and other details, please refer to tender
Read moreMas -gdr section: removal of vegetation, jungle & bushes along side the track, in between the tracks and weed control using chemical weedicide in up and down lines between enr-elr (km.13/800 to km. 52/500) in sse/pway/pon section in aden/spe sub division for a period of one year.
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : sw i : slope stabilization by wire netting of slopes in cuttings from km 48/600-700, 49/000-100 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw ii : slope stabilization by wire netting of slopes in cuttings from km 49/200-340 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw iii : slope stabilization by wire netting of slopes in cuttings from km 50/100-300 between thoppur (tpp) and muttampatti (mp
For complete deion and other details, please refer to tender
Read moreBaiyyappanahalli-dharmavaram section: proposed for extra approach road provision at rub/br no. pd-66a at km.22/600-700 between sri sathya sai prashanthi nilayam (sspn) - kotha cheruvu (ktcr) stations and completion of pending rcc pipe drain work at water logging rub no.pd-66 at km.22/600-700 between sri sathya sai prashanthi nilayam (sspn) - basampalle (bspl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type