Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Salem Bengaluru Section : Slope Stabilization By Wire Netting Of Slopes In Cuttings From Km 50/100 300 Between Toppur (Tpp) And Muttampatti (Mpc) Stations In Sse/Pway/Dharmapuri (South) Section. Maintenance Period Is 12 Months
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77589682 |
|
Reference Number |
23SBC24OF27-09-24Item-05 |
| Tender Fee | 0 |
| EMD | 4.92 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77589682/viewNitPdf_4725411.pdf |
| Start Date | September 27, 2024 22:18 |
| End Date |
Expired
21/10/2024
Expired 684 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bengaluru - salem section : sw i : slope stabilization by wire netting of slopes in cuttings from km 48/600-700, 49/000-100 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw ii : slope stabilization by wire netting of slopes in cuttings from km 49/200-340 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw iii : slope stabilization by wire netting of slopes in cuttings from km 50/100-300 between thoppur (tpp) and muttampatti (mp
For complete deion and other details, please refer to tender
Read moreSalem - bengaluru section : slope stabilization by wire netting of slopes in cuttings from km 48/600-700, 49/000-100 between toppur (tpp) and muttampatti (mpc) stations in sse/pway/dharmapuri (south) section. maintenance period is 12 months
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : slope stabilization by widening of slopes of cuttings from km 50/000-100, 50/800-51/050, 51/300-500, 51/760-880 in sse/pway/tpp between muttampatti (mpc) and sivadi (szv) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikkabanavara - hassan section : sw i : slope stabilization by widening of slopes of cuttings from km 145/100-146/300 between d-samudravalli (dsvs) - shantigrama (siga) stations in sse/pway/cnpa section. sw ii : slope stabilization by widening of slopes of cuttings from km 130/800-132/200, 136/200-900 and 143/600-144/600 between shravanabelagola (sbga) - shantigrama (siga) stations in sse/pway/cnpa section. (two-packet tender)
For complete deion and other details, please refer to tender
Read moreKpd-tpty section: proposed repairs to side slopes in cuttings and providing drains in cuttings in sse/p/cto section under den/west jurisdiction
For complete deion and other details, please refer to tender
Read moreBengaluru salem section : sw i : slope stabilization by widening of slopes of cuttings from km 51/940-52/100, 52/550-800, 52/900-53/040 in sse/pway/dharmapuri (south) section. sw ii : slope stabilization by widening of slopes in cuttings from km 111/000-112/400, 127/630-800, 129/400-130/000 and 137/100-200 in aden/dharmapuri section. maintenance period is 6 months or one monsoon period whichever is later. (two packet system)
For complete deion and other details, please refer to tender
Read moreChikkabanavara - hassan section : sw i : slope stabilization by widening of slope and wire netting from km 159/020-420 b/w shantigrama (siga) - hassan (has) stations in sse/pway/cnpa sub-division. sw ii : slope stabilization by widening of slope and wire netting from km 159/440-159/840 in approach of shantigrama (siga) station. sw iii : slope stabilization by wire netting from km 148/450-800 b/w d-samudravalli (dsvs) - shantigrama (siga) stations in sse/pway/cnpa section. maintenance period
For complete deion and other details, please refer to tender
Read moreTcr pway section-protection of slopes in cutting locations by providing steel wire rope net to avoid boulder falls
For complete deion and other details, please refer to tender
Read moreHubballi division-sw-i-protection of track from falling of boulders from vertical cuttings by provision of boulder netting in londa-vasco (ld-vsg) section at in between km 29/300 to 40/100. sw-ii-stabilization of vulnerable cutting slopes by provision of wire mesh with turf reinforcement mat along with self drilling anchor and rock fall barriers in castlerock-kulem(clr-qlm) section. (special conditions to be follow)
For complete deion and other details, please refer to tender
Read moreA) bridge waterway cleaning and removal of muck from bridges to avoid flooding in kyn-kjt, kjt-pnvl & nrl-mae section. b) clearing of waterway of bridges of nrl-mae section chocked up due to large boulders & rocks obstructing waterway by cutting, splitting the large boulders c) boulder scanning of hill slopes, cuttings and ping of loose boulders/rocks from hill slopes and cuttings and tunnel sounding of tunnel t1 & t2 in pnvl-kjt section under aden t kyn.
For complete deion and other details, please refer to tender
Read moreof your Industry type