Tender Details
Particulars | Details |
---|---|
Title |
Salem Bengaluru Section : Slope Stabilization By Wire Netting Of Slopes In Cuttings From Km 48/600 700, 49/000 100 Between Toppur (Tpp) And Muttampatti (Mpc) Stations In Sse/Pway/Dharmapuri (South) Section. Maintenance Period Is 12 Months
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77586633 |
Reference Number |
23SBC24OF27-09-24Item-04 |
Tender Fee | 0 |
EMD | 4.56 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77586633/viewNitPdf_4725188.pdf |
Start Date | September 27, 2024 22:14 |
End Date |
21/10/2024 ( Expired 181 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bengaluru - salem section : sw i : slope stabilization by wire netting of slopes in cuttings from km 48/600-700, 49/000-100 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw ii : slope stabilization by wire netting of slopes in cuttings from km 49/200-340 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw iii : slope stabilization by wire netting of slopes in cuttings from km 50/100-300 between thoppur (tpp) and muttampatti (mp
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : slope stabilization by widening of slopes of cuttings from km 50/000-100, 50/800-51/050, 51/300-500, 51/760-880 in sse/pway/tpp between muttampatti (mpc) and sivadi (szv) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru salem section : sw i : slope stabilization by widening of slopes of cuttings from km 51/940-52/100, 52/550-800, 52/900-53/040 in sse/pway/dharmapuri (south) section. sw ii : slope stabilization by widening of slopes in cuttings from km 111/000-112/400, 127/630-800, 129/400-130/000 and 137/100-200 in aden/dharmapuri section. maintenance period is 6 months or one monsoon period whichever is later. (two packet system)
For complete deion and other details, please refer to tender
Read moreSalem - bengaluru section : slope stabilization by wire netting of slopes in cuttings from km 50/100-300 between toppur (tpp) and muttampatti (mpc) stations in sse/pway/dharmapuri (south) section. maintenance period is 12 months
For complete deion and other details, please refer to tender
Read moreSalem - bengaluru section : slope stabilization by wire netting of slopes in cuttings from km 48/600-700, 49/000-100 between toppur (tpp) and muttampatti (mpc) stations in sse/pway/dharmapuri (south) section. maintenance period is 12 months
For complete deion and other details, please refer to tender
Read moreHubballi division: sw-i: protection of track from falling of boulders from vertical cuttings by provision of boulder netting at km.30/400-500, 33/400-500, 37/700-800 & 38/900 39 / 100 in carnzol(crz)-sonalium(lim) section. sw-ii: stabilization of vulnerable cutting slopes by provision of erosion control geomat/turf reinforcement mat arrangement and catch water drains at km.23/000-100, 31/200-300, 34/600-700 & 99/100-200 in londa(ld) - vasco da-gama (vsg) section. (two packet system)(no
For complete deion and other details, please refer to tender
Read moreof your Industry type