Tender Details
Particulars | Details |
---|---|
Title |
Bengaluru Salem Section : Sw I : Slope Stabilization By Widening Of Slopes Of Cuttings From Km 51/940 52/100, 52/550 800, 52/900 53/040 In Sse/Pway/Dharmapuri (South) Section. Sw Ii : Slope Stabilization By Widening Of Slopes In Cuttings From Km 111/000 112/400, 127/630 800, 129/400 130/000 And 137/100 200 In Aden/Dharmapuri Section. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later. (Two Packet System)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78325044 |
Reference Number |
27SBC24OF12-11-24Item-02 |
Tender Fee | 0 |
EMD | 7.38 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78325044/viewNitPdf_4765810.pdf |
Start Date | November 12, 2024 22:39 |
End Date |
09/12/2024 ( Expired 133 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bengaluru - salem section : sw i : slope stabilization by wire netting of slopes in cuttings from km 48/600-700, 49/000-100 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw ii : slope stabilization by wire netting of slopes in cuttings from km 49/200-340 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw iii : slope stabilization by wire netting of slopes in cuttings from km 50/100-300 between thoppur (tpp) and muttampatti (mp
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : slope stabilization by widening of slopes of cuttings from km 50/000-100, 50/800-51/050, 51/300-500, 51/760-880 in sse/pway/tpp between muttampatti (mpc) and sivadi (szv) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 50 at km 85/800-900 between mallasandra (mlsa) - gubbi (gbb) station for double track. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru salem section : sw i : slope stabilization by widening of slopes of cuttings from km 51/940-52/100, 52/550-800, 52/900-53/040 in sse/pway/dharmapuri (south) section. sw ii : slope stabilization by widening of slopes in cuttings from km 111/000-112/400, 127/630-800, 129/400-130/000 and 137/100-200 in aden/dharmapuri section. maintenance period is 6 months or one monsoon period whichever is later. (two packet system)
For complete deion and other details, please refer to tender
Read moreSalem - bengaluru section : slope stabilization by wire netting of slopes in cuttings from km 50/100-300 between toppur (tpp) and muttampatti (mpc) stations in sse/pway/dharmapuri (south) section. maintenance period is 12 months
For complete deion and other details, please refer to tender
Read moreSalem - bengaluru section : slope stabilization by wire netting of slopes in cuttings from km 48/600-700, 49/000-100 between toppur (tpp) and muttampatti (mpc) stations in sse/pway/dharmapuri (south) section. maintenance period is 12 months
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreSw-i:- has-majn section: ancillary works for improvements to road to rub no. 628a at km. 173/400-500 in aden/sklr sub-division. sw-ii:- has - majn section: replacement of existing shallow type girder in bridge no.473 (1x7.310m) at km.129/000-100 with rcc box of size 1x7.50x4.65m between knyr-nrj stations.(rolling/launching method)
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : sw i : yesvantpur - sampige road section : proposed limited height subway at old lc 43 (lhs no. 297/b) km 73/000-100 at bheemasandra - rcc box of size 1x5x2.25 by rolling/launching method in aden/yesvantpur sub-division. sw ii : yesvantpur - sampige road section : proposed pedestrian subway at old shettyhalli gate km 67/700-800 near shettyhalli - rcc box of size 1x4x2.25 by rolling/launching method in aden/yesvantpur sub-division. maintenance period is 6 months or one
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: strengthening of bank by providing standard width and improving drainage at isolated locationsfrom km 216/000-238a/000 up and down line for 8.66kms and 289/100-302/600 up and down for 5.653kms (total length - 14.313kms). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type