Tender Details
Particulars | Details |
---|---|
Title |
Bengaluru Dharmavaram Section : Construction Of Rcc Drain For 4.5 Kms At Isolated Locations Between Km 128/700 134/700 Between Rangepalli (Repi) Penukonda (Pkd) In Sse/Pway/Pkd Section. Maintenance Period Is 6 Months
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79412035 |
Reference Number |
01SBC25OF07-01-25Item-12 |
Tender Fee | 0 |
EMD | 2.92 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79412035/viewNitPdf_4826447.pdf |
Start Date | January 08, 2025 00:18 |
End Date |
03/02/2025 ( Expired 98 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bengaluru - salem section : sw i : slope stabilization by wire netting of slopes in cuttings from km 48/600-700, 49/000-100 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw ii : slope stabilization by wire netting of slopes in cuttings from km 49/200-340 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw iii : slope stabilization by wire netting of slopes in cuttings from km 50/100-300 between thoppur (tpp) and muttampatti (mp
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreBengaluru - dharmavaram section : construction of rcc drain for 4.5 kms at isolated locations between km 128/700-134/700 between rangepalli (repi) - penukonda (pkd) in sse/pway/pkd section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : slope stabilization by widening of slopes of cuttings from km 50/000-100, 50/800-51/050, 51/300-500, 51/760-880 in sse/pway/tpp between muttampatti (mpc) and sivadi (szv) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru-dharmavaram section: construction of rcc side drain for a length of 1200m in connection with the work of complete track renewal(p) of existing 60kg rails on 60kg psc with 60kg 90uts rails on 60kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn & 56/134-58/100 up between oddarahalli - thondebhavi station in sse/pway/hup section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreBengaluru salem section : sw i : slope stabilization by widening of slopes of cuttings from km 51/940-52/100, 52/550-800, 52/900-53/040 in sse/pway/dharmapuri (south) section. sw ii : slope stabilization by widening of slopes in cuttings from km 111/000-112/400, 127/630-800, 129/400-130/000 and 137/100-200 in aden/dharmapuri section. maintenance period is 6 months or one monsoon period whichever is later. (two packet system)
For complete deion and other details, please refer to tender
Read moreBaiyyappanahalli-dharmavaram section: proposed for extra approach road provision at rub/br no. pd-66a at km.22/600-700 between sri sathya sai prashanthi nilayam (sspn) - kotha cheruvu (ktcr) stations and completion of pending rcc pipe drain work at water logging rub no.pd-66 at km.22/600-700 between sri sathya sai prashanthi nilayam (sspn) - basampalle (bspl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : sw i : complete track renewal (p) of existing 60kg rails on 60kg psc with 60kg 90 uts rails on 60 kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn and 56/134-58/100 up between oddarahalli (orh) - thondebhavi (tdv) station in sse/pway/hup section. sw ii : penukonda-satya sai prashanthi nilayam-dharmavaram section : trr(p) of existing 52kg rails with 60kg rails for a length of 9 km from 19/000-19/500, 20/500-24/200, 24/200-26/000 and 27/000-30/000 sl. sw i
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : bengaluru-sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 60 at km 98/600-700 between nittur (ntr) and sampige road (spgr) stations for double track along with u-type rcc retaining wall and bt road connecting lc no. 60 and lc no. 59. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSalem - bengaluru section : slope stabilization by wire netting of slopes in cuttings from km 50/100-300 between toppur (tpp) and muttampatti (mpc) stations in sse/pway/dharmapuri (south) section. maintenance period is 12 months