Tender Details
Particulars | Details |
---|---|
Title |
Sw I : Bengaluru Sampige Road And Lottegollahalli Yelahanka Section : Construction Of Rcc Side Drain For A Length Of 4.60 Km At Isolated Location Between Km 19/300 To 26/900 (Dn Line 3.65 Km) Of Bengaluru Arasikere And Km 10/750 15/00 (Up Line 950m) In Sse/Pway/Ypr Section.
Sw Ii : Yelahanka Bangarpet Section : Construction Of Rcc Side Drain For A Length Of 4.60 Km At Isolated Location Between Km 17/000 75/200 Between Yelahanka Chintamani Stations In Sse/Pway/Ynk Section. Mainte
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79412881 |
Reference Number |
01SBC25OF07-01-25Item-13 |
Tender Fee | 0 |
EMD | 4.4 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79412881/viewNitPdf_4826488.pdf |
Start Date | January 08, 2025 00:20 |
End Date |
03/02/2025 ( Expired 76 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bengaluru - salem section : sw i : slope stabilization by wire netting of slopes in cuttings from km 48/600-700, 49/000-100 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw ii : slope stabilization by wire netting of slopes in cuttings from km 49/200-340 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw iii : slope stabilization by wire netting of slopes in cuttings from km 50/100-300 between thoppur (tpp) and muttampatti (mp
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section : proposed extension road surface at lc 143 in aden/dpj section. sw ii : chikka banavara - hassan section : construction of rcc side drain for a length of 750m in connection with the work of strengthening of bank by providing standard width and improving drainage at isolated locations from km 3/870 to 79/530 (sl) for a length of 16.65 km. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreBengaluru - dharmavaram section : construction of rcc drain for 4.5 kms at isolated locations between km 128/700-134/700 between rangepalli (repi) - penukonda (pkd) in sse/pway/pkd section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreBaiyappanahalli - dharmavaram section: replacement of rcc slabs of span 2 x 11.755 mtr with psc slabs for up line for rub no. 516-a at km 15/452 between channasandra (csdr) - yelahanka (ynk) and for dn line between yesvanthpur (ypr) - yelahanka (ynk) at km 17/300-400 with psc slabs. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreBengaluru-dharmavaram section: construction of rcc side drain for a length of 1200m in connection with the work of complete track renewal(p) of existing 60kg rails on 60kg psc with 60kg 90uts rails on 60kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn & 56/134-58/100 up between oddarahalli - thondebhavi station in sse/pway/hup section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw i : yelahanka - rajanakunte : pro. construction of goomties at lc 20 between km 23/000-100. sw ii : construction of rcc drain for a length of 2160m in connection with the work of bengaluru -sampige road and bangalore - dharmavaram sec: through turnout renewal (ttr) of existing curved switch and cms crossing with 60 kg tws and 60 kg weldable crossing - 1in12 - total : 48 nos in sbc-spgr section in aden/yeswanthpur section and through ballast recoupment (tbr) of points and crossings - 13 nos
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru -sampige road sec: earthwork in connection with the work of compete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts rails and 60 kg wider base sleeper of 1660/km for a length of 17.15 km from km 17/650-10/500 and 39/000-49/000 dn line in aden/yeswanthpur section. sw ii : bengaluru -sampige road sec: earthwork in connection with the work of complete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts ra
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru -sampige road sec : complete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 17.15 km from km 17/650 - 10/500 and 39/000 - 49/000 dn line in aden/ypr section. sw ii : bengaluru -sampige road sec : complete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper 1660/km for a length of 21.35 km from km 17/650 - 39/000 u
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : sw i : complete track renewal (p) of existing 60kg rails on 60kg psc with 60kg 90 uts rails on 60 kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn and 56/134-58/100 up between oddarahalli (orh) - thondebhavi (tdv) station in sse/pway/hup section. sw ii : penukonda-satya sai prashanthi nilayam-dharmavaram section : trr(p) of existing 52kg rails with 60kg rails for a length of 9 km from 19/000-19/500, 20/500-24/200, 24/200-26/000 and 27/000-30/000 sl. sw i
For complete deion and other details, please refer to tender
Read moreof your Industry type