Tender Details
Particulars | Details |
---|---|
Title |
Sw I : Bengaluru Sampige Road Section : Manufacturing, Supply, Including Leading And Loading Of Ballast At Nittur (Ntr) Depot (Quantity : 20334 Cum), In Connection With The Work Of (A)through Ballast Recoupment Of Points And Crossings 6 Points In Dodbele (Dbl) Yard And 4 Points In Hirehalli (Hhl) Yard, (B) Through Ballast Recoupment For A Length Of 3.3km From 42/500 46/800 In Yelahanka Chikkaballapur Section And Bengaluru Arsikere And Bengaluru Dharmavaram Section : Through Bal
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73918541 |
Reference Number |
05SBC24of05-03-24Item-04 |
Tender Fee | 0 |
EMD | 2.42 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73918541/viewNitPdf_4498253.pdf |
Start Date | March 05, 2024 17:28 |
End Date |
27/03/2024 ( Expired 391 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bengaluru - mysuru section: sw-i: through ballast recoupment for a length of 43.20kms from km 62/000 - 101/700 on up and km 81/750-85/250 down line. sw-ii: through ballast recoupment - 0.8ikm (loop lines) and 16 nos. points and crossings.
For complete deion and other details, please refer to tender
Read moreSw i : yelahanka - rajanakunte : pro. construction of goomties at lc 20 between km 23/000-100. sw ii : construction of rcc drain for a length of 2160m in connection with the work of bengaluru -sampige road and bangalore - dharmavaram sec: through turnout renewal (ttr) of existing curved switch and cms crossing with 60 kg tws and 60 kg weldable crossing - 1in12 - total : 48 nos in sbc-spgr section in aden/yeswanthpur section and through ballast recoupment (tbr) of points and crossings - 13 nos
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : sw i : collection and supply of ballast at makajapalli (mkj) depot (quantity : 21,540 cum) including leading and loading in connection with the work of (i) through ballast recoupment of points and crossings - 4 points at orh yard and 5 points at mkl yard (total - 9 nos). (ii) through turnout renewal of existing 1in12 curved switch and cms crossing with tws and weldable cms crossing - 08 nos at ynk yard (100 a, 101 a, 102 b, 103 a, 104 a, 105 a, 105 b, 106 b). (iii) thro
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: through ballast recoupment for a length of 43.20kms from km 62/000 - 101/700 on up and km 81/750-85/250 down line. sw-ii: through ballast recoupment - 0.8ikm (loop lines) and 16 nos. points and crossings.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreElectrical arrangements for (1) improvements of pit lines 1, 2, 3 & 4 in yesvantpur yard (2) nittur -sampige road section: left over works by construction organization of tumkur-arsikere doubling project and (3) yelahanka - provision of platform shelter at pf - 1, 2/3 & 4/5 total 1261 sqm
For complete deion and other details, please refer to tender
Read moreSw-i: bengaluru - salem sec: strengthening of bank by providing standard width in isolated locations for a length of 18.85km from km 145/650-165/600 sl in aden/dharmapuri section. sw-ii: bengaluru - salem sec: cess work in connection with the work of through ballast recoupment of points and crossings at dharmapuri (dpj), rayakkottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards-total 11 nos in aden/dharmapuri section. maintenance period is 6 months or one mo
For complete deion and other details, please refer to tender
Read moreSw i : baiyappanahalli - dharmavaram section : construction of foot over bridge (fob) at km 24/600-700 at rajanukunte (rnn) yard near rob no. 498-a for pedestrian movement (3m wide and 4 track crossing) as per rdso drg. no. b-10405. sw ii : bengaluru - arsikere section : proposed foot over bridge (fob) at muddalinganahalli (mdll) station at km 44/050. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc jurisdiction : sw i : aden/yesvanthpur sub-division : proposed construction of toilets for divyang persons at heggere halt (hei), mallasandra (mlsa), gubbi (gbb), nittur (ntr), sampige road (spgr) and yelahanka (ynk) pf no. 4/5 stations. sw ii : aden/yesvanthpur sub-division : provision of divyangjan facilities like toilets, drinking water booths, railing, non-slippery walkways, ramps and trolley path at chikka banavara (baw), golhalli (ghl), dodbele (dbl), nidavanda (ndv), d
For complete deion and other details, please refer to tender
Read moreof your Industry type