Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sw I : Bengaluru Dharmavaram Section : Rcc Drain In Connection With The Work Of Through Ballast Recoupment Of Points And Crossings 4 Points At Oddarahalli (Orh) Yard And 5 Points At Makalidurga (Mkl) Yard (Total 9 Numbers) . Sw Ii : Yesvanthpur Proposed Covering Of Open Drain Of Pf No. 3, Pf No. 4 And Pf No. 5/6 At Yesvanthpur Station. Maintenance Period Is 12 Months
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72783116 |
|
Reference Number |
19SBC23OF28-12-2023Item-3 |
| Tender Fee | 0 |
| EMD | 2.58 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72783116/viewNitPdf_4437000.pdf |
| Start Date | December 28, 2023 22:51 |
| End Date |
Expired
22/01/2024
Expired 993 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sw i : bengaluru - sampige road section : improvements to staff quarters at chikka banavara, golhalli, dodbele, hirehalli, kyatsandra, tumakuru, heggere, gubbi station colonies. sw ii : yesvanthpur : improvements to quarters of yesvanthpur colony. maintenance period is 12 months sw iii : bengaluru - dharmavaram section: improvements to staff quarters at dodballapur, makalidurga, thondebhavi, gauribidanur, hindupur, penukonda and sri satya sai prashanthi nilayam colonies in aden/hup jurisdicti
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road section : manufacturing, supply, including leading and loading of ballast at nittur (ntr) depot (quantity : 20334 cum), in connection with the work of (a)through ballast recoupment of points and crossings - 6 points in dodbele (dbl) yard and 4 points in hirehalli (hhl) yard, (b) through ballast recoupment for a length of 3.3km from 42/500-46/800 in yelahanka - chikkaballapur section and bengaluru - arsikere and bengaluru - dharmavaram section : through bal
For complete deion and other details, please refer to tender
Read moreSw-i: bengaluru - dharmavaram section: increasing sleeper density of existing 52 kg psc sleepers of 1310/km to 1540/km for a length of 4.2 km in loop lines of sse/pway/yelahanka section [channasandra (csdr) : rd-1, rd-3 & rd-4, yelahanka (ynk) : rd-1 and rd-2 in sr den/north/sbc section]. sw-ii: bengaluru - sampige road section: through ballast recoupment of points & crossings - 6 points in dodbele (dbl) yard and 4 points in hirehalli (hhl) yard - (total 10 nos). sw-iii: bengaluru - sa
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road section : proposed construction of rcc drain in connection with the work of through ballast recoupment of points and crossings - 6 points in dodbele (dbl) yard and 4 points in hirehalli (hhl) yard (total 10 nos.,) . sw ii : bengaluru - sampige road sec : construction of balance retaining wall, approach road etc., of rub in lieu of lc-37 at km 64/200-300 in kyatsandra (kiat) station yard. sw iii : yelahanka - chintamani section : proposed improvement
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: through ballast recoupment for a length of 43.20kms from km 62/000 - 101/700 on up and km 81/750-85/250 down line. sw-ii: through ballast recoupment - 0.8ikm (loop lines) and 16 nos. points and crossings.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: through ballast recoupment for a length of 43.20kms from km 62/000 - 101/700 on up and km 81/750-85/250 down line. sw-ii: through ballast recoupment - 0.8ikm (loop lines) and 16 nos. points and crossings.
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : sw i : collection and supply of ballast at makajapalli (mkj) depot (quantity : 21,540 cum) including leading and loading in connection with the work of (i) through ballast recoupment of points and crossings - 4 points at orh yard and 5 points at mkl yard (total - 9 nos). (ii) through turnout renewal of existing 1in12 curved switch and cms crossing with tws and weldable cms crossing - 08 nos at ynk yard (100 a, 101 a, 102 b, 103 a, 104 a, 105 a, 105 b, 106 b). (iii) thro
For complete deion and other details, please refer to tender
Read moreSw i: replacement of steel girder with psc slab for bridge no. 490 (1x12.20m) at km 29/800-900 between rajanukunte and dodballapur stations of baiyappanahalli - dharmavaram section. sw ii : bengaluru - tumakuru : strengthening of bridge no. 268 at km 93/000-200 in aden/yesvanthpur subdivision. sw iii : proposed fixing of sign boards on approaches of bridges ie., br. no. 535 up, 516 up, 490, 480, 434, 319, 288, 285, 281, 268, 266, 259, 224, 214 and 197 of baiyappanahalli (bypl) - dharmavaram
For complete deion and other details, please refer to tender
Read moreSw i : chikka banavara - hassan section : through ballast recoupment for a length of 7.881 km in looplines of b g nagar (bgnr), hirisave (hise), shravanabelagola (sbga), channarayapatna (cnpa) and samudravalli (dsvs) yards. sw ii : bengaluru - salem section : through ballast recoupment of points and crossing at dharmapuri (dpj), rayakottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards - total 11 nos in aden/dharmapuri section. sw iii : bengaluru - salem sec
For complete deion and other details, please refer to tender
Read moreSw i : aden/yesvanthpur sub-division : provision of rdso type height gauges for (bridge no) rubs no. 540-a, 516-b in yelahanka - dharmavaram section & 169-a, 154-c, 134-a and 149-b in yelahanka - bangarpet section under aden/ypr subdivision. sw ii : aden/ypr sec : provision of rdso type height gauges for rubs no. 308-c, 420-a, 390 in bengaluru - sampige road section and 589-a, 529-dn and 524-b in yesvanthpur - yelahanka section under aden/ypr subdivision. sw iii : aden/hindupur sub-div
For complete deion and other details, please refer to tender
Read moreof your Industry type