Tender Details
About Tender
🚂 Invitation For Bids: Railway Construction Projects 🛠️ The Ministry Of Railways, Central Government, Invites Bids For The Following Construction Projects Under The South Western Railway (Swr) Division: 1. Sw I: Proposed Construction Of Rcc Drain In Connection With The Work Of Through Ballast Recoupment Of Points And Crossings At Dodbele (Dbl) Yard And Hirehalli (Hhl) Yard, Bengaluru. 2. Sw Ii: Construction Of Balance Retaining Wall, Approach Road Etc., Of Rub In Lieu Of Lc 37 At Km 64/200 300 In Kyatsandra (Kiat) Station Yard, Bengaluru. 3. Sw Iii: Proposed Improvement On Yelahanka Chintamani Section. 🗓️ Bid Submission Deadline: June 06, 2024, 3:00 Pm Emd: Inr 286,600 Interested Bidders Are Requested To Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Tender Documents. Keywords: Railway Construction, South Western Railway, Ministry Of Railways, Civil Works, Infrastructure Development, Tender, Bid Submission, Engineering Procurement And Construction (Epc)Particulars | Details |
---|---|
Title |
Sw I : Bengaluru Sampige Road Section : Proposed Construction Of Rcc Drain In Connection With The Work Of Through Ballast Recoupment Of Points And Crossings 6 Points In Dodbele (Dbl) Yard And 4 Points In Hirehalli (Hhl) Yard (Total 10 Nos.,) . Sw Ii : Bengaluru Sampige Road Sec : Construction Of Balance Retaining Wall, Approach Road Etc., Of Rub In Lieu Of Lc 37 At Km 64/200 300 In Kyatsandra (Kiat) Station Yard. Sw Iii : Yelahanka Chintamani Section : Proposed Improvement
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74360529 |
Reference Number |
11SBC24OF14-05-24Item-01 |
Tender Fee | 0 |
EMD | 2.87 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/062024/74360529/viewNitPdf_4522644.pdf |
Start Date | May 14, 2024 22:15 |
End Date |
06/06/2024 ( Expired 319 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Execution of signaling & telecommunication work in connection with: (1) bilaspur-durg: bilaspur - durg ctr(s) - 13.393 tkm & raipur - lakholi - ctr(s) - 18.659 tkm., (2) bilaspur-durg-ttr(cmsc)- 37 sets, ttr (tws)- 21 set & ttr (cs) - 41 sets, (3) construction of rub (fhs) at km 734/33-735/35a in lieu of manned level crossing no. 373 (belha yard) at km 734/25-27 between belha-dagori section in howrah-mumbai main line on cost sharing basis, (4) construction of rub in lieu of lc no.
For complete deion and other details, please refer to tender
Read moreElectrical work for construction of restricted height subway for trespasser in lieu of closed lc at prr yard near shankar chitralaya by cut & cover method, (b) construction of rub/subway for elimination of manned level crossings 1 no. for jc-52 between cni-prr section, (c) construction of rub/subway for elimination of manned level crossings bg-20 between tle-mhq & bg-26 between mhq-knf section by cut & cover method in adra division of s.e.railway.
For complete deion and other details, please refer to tender
Read moreZ.o.iv.c.no.b3/0481/2024 proposed construction of rob in lieu of existing lc no. 2b at th road in dn. 37,unit-09, zone - iv - to provide approach to the service bridge on the southern side the existing play field compound wall to be demolished and
Z.o.iv.c.no.b3/0481/2024 proposed construction of rob in lieu of existing lc no. 2b at th road in dn. 37,unit-09, zone - iv - to provide approach to the service bridge on the southern side the existing play field compound wall to be demolished and
Read moreBengaluru - mysuru section: sw-i: through ballast recoupment for a length of 43.20kms from km 62/000 - 101/700 on up and km 81/750-85/250 down line. sw-ii: through ballast recoupment - 0.8ikm (loop lines) and 16 nos. points and crossings.
For complete deion and other details, please refer to tender
Read moreBengaluru - sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 50 at km 85/800-900 between mallasandra (mlsa) - gubbi (gbb) station for double track. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSw i : yelahanka - rajanakunte : pro. construction of goomties at lc 20 between km 23/000-100. sw ii : construction of rcc drain for a length of 2160m in connection with the work of bengaluru -sampige road and bangalore - dharmavaram sec: through turnout renewal (ttr) of existing curved switch and cms crossing with 60 kg tws and 60 kg weldable crossing - 1in12 - total : 48 nos in sbc-spgr section in aden/yeswanthpur section and through ballast recoupment (tbr) of points and crossings - 13 nos
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : sw i : collection and supply of ballast at makajapalli (mkj) depot (quantity : 21,540 cum) including leading and loading in connection with the work of (i) through ballast recoupment of points and crossings - 4 points at orh yard and 5 points at mkl yard (total - 9 nos). (ii) through turnout renewal of existing 1in12 curved switch and cms crossing with tws and weldable cms crossing - 08 nos at ynk yard (100 a, 101 a, 102 b, 103 a, 104 a, 105 a, 105 b, 106 b). (iii) thro
For complete deion and other details, please refer to tender
Read moreDeposit construction of road under bridge rub in lieu of lc no 12 at nilambur yard supply of ms pipes di pipes di specials suitable for re alignment of pumping main of arwss to amarambalam general civil work
Deposit construction of road under bridge rub in lieu of lc no 12 at nilambur&#x0d yard supply of ms pipes di pipes di specials suitable for re alignment of&#x0d pumping main of arwss to amarambalam general civil work
Read moreSr. den/north/sbc sec : bengaluru-sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 60 at km 98/600-700 between nittur (ntr) and sampige road (spgr) stations for double track along with u-type rcc retaining wall and bt road connecting lc no. 60 and lc no. 59. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: through ballast recoupment for a length of 43.20kms from km 62/000 - 101/700 on up and km 81/750-85/250 down line. sw-ii: through ballast recoupment - 0.8ikm (loop lines) and 16 nos. points and crossings.
For complete deion and other details, please refer to tender
Read moreof your Industry type