Sw I: Bengaluru Dharmavaram Section: Increasing Sleeper Density Of Existing 52 Kg Psc Sleepers Of 1310/Km To 1540/Km For A Length Of 4.2 Km In Loop Lines Of Sse/Pway/Yelahanka Section [Channasandra (Csdr) : Rd 1, Rd 3 &Amp Rd 4, Yelahanka (Ynk) : Rd 1 And Rd 2 In Sr Den/North/Sbc Section].
Sw Ii: Bengaluru Sampige Road Section: Through Ballast Recoupment Of Points &Amp Crossings 6 Points In Dodbele (Dbl) Yard And 4 Points In Hirehalli (Hhl) Yard (Total 10 Nos).
Sw Iii: Bengaluru Sa
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73409431 |
|
Reference Number |
04SBC24OF16-02-24Item-1 |
| Tender Fee | 0 |
| EMD | 1.33 Lakh |
| Tender Value | |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73409431/viewNitPdf_4471259.pdf |
| Start Date | February 16, 2024 18:10 |
| End Date |
Expired
11/03/2024
Expired 816 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sw i : bengaluru - sampige road section : proposed construction of rcc drain in connection with the work of through ballast recoupment of points and crossings - 6 points in dodbele (dbl) yard and 4 points in hirehalli (hhl) yard (total 10 nos.,) . sw ii : bengaluru - sampige road sec : construction of balance retaining wall, approach road etc., of rub in lieu of lc-37 at km 64/200-300 in kyatsandra (kiat) station yard. sw iii : yelahanka - chintamani section : proposed improvement
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road section : manufacturing, supply, including leading and loading of ballast at nittur (ntr) depot (quantity : 20334 cum), in connection with the work of (a)through ballast recoupment of points and crossings - 6 points in dodbele (dbl) yard and 4 points in hirehalli (hhl) yard, (b) through ballast recoupment for a length of 3.3km from 42/500-46/800 in yelahanka - chikkaballapur section and bengaluru - arsikere and bengaluru - dharmavaram section : through bal
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreBangalore - jolarpettai section: sw-i: increasing of sleeper density of existing psc from 1540 sleepers/km to 1660 sleeper/km on up line at km 220/700-231/300 and 240/200-251/000 for a length of 21.4km in den/e/sbc section. sw-ii: bangalore -jolarpettai section: through ballast recoupment in points and crossings for 12nos.
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc jurisdiction : sw i : aden/yesvanthpur sub-division : proposed construction of toilets for divyang persons at heggere halt (hei), mallasandra (mlsa), gubbi (gbb), nittur (ntr), sampige road (spgr) and yelahanka (ynk) pf no. 4/5 stations. sw ii : aden/yesvanthpur sub-division : provision of divyangjan facilities like toilets, drinking water booths, railing, non-slippery walkways, ramps and trolley path at chikka banavara (baw), golhalli (ghl), dodbele (dbl), nidavanda (ndv), d
For complete deion and other details, please refer to tender
Read moreSw i : yelahanka - rajanakunte : pro. construction of goomties at lc 20 between km 23/000-100. sw ii : construction of rcc drain for a length of 2160m in connection with the work of bengaluru -sampige road and bangalore - dharmavaram sec: through turnout renewal (ttr) of existing curved switch and cms crossing with 60 kg tws and 60 kg weldable crossing - 1in12 - total : 48 nos in sbc-spgr section in aden/yeswanthpur section and through ballast recoupment (tbr) of points and crossings - 13 nos
For complete deion and other details, please refer to tender
Read moreSw i: penukonda - dharmavaram section: complete track renewal (primary) for a length of 0.6 kms from 0/000 to 0/600 at penukonda yard road - 1 (sspn line) and through turnout renewal (primary) of point number - 62a at pkd yard between km 0/180-0/240 (1 set) in sse/pway/pkd section. sw ii : bengaluru - dharmavaram section : through fittings renewal for a length of 15.4 km from km 56/700 to 72/100 dn line in sse/pway/hup section. sw iii : yelahanka - chintamani section : replacement of over aged
For complete deion and other details, please refer to tender
Read moreSw i : manufacturing, supply and stacking of machine crushed track ballast including leading and loading at periya naga thunai (prnt) depot (quantity = 21,150 cum) in connection with the work of (a) bengaluru-salem section : increasing sleeper density of existing 52kg psc sleepers of 1310/km to 1540/km for a length of 9.565km in loop lines of aden/dharmapuri, (b) chikka banavara - hassan section : through ballast recoupment of points and crossings at nelamangala (nmga) yard - 08 nos., (c) thro
For complete deion and other details, please refer to tender
Read moreof your Industry type