Tender Details
Particulars | Details |
---|---|
Title |
Sw I: Bengaluru Dharmavaram Section: Increasing Sleeper Density Of Existing 52 Kg Psc Sleepers Of 1310/Km To 1540/Km For A Length Of 4.2 Km In Loop Lines Of Sse/Pway/Yelahanka Section [Channasandra (Csdr) : Rd 1, Rd 3 &Amp Rd 4, Yelahanka (Ynk) : Rd 1 And Rd 2 In Sr Den/North/Sbc Section].
Sw Ii: Bengaluru Sampige Road Section: Through Ballast Recoupment Of Points &Amp Crossings 6 Points In Dodbele (Dbl) Yard And 4 Points In Hirehalli (Hhl) Yard (Total 10 Nos).
Sw Iii: Bengaluru Sa
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73409431 |
Reference Number |
04SBC24OF16-02-24Item-1 |
Tender Fee | 0 |
EMD | 1.33 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73409431/viewNitPdf_4471259.pdf |
Start Date | February 16, 2024 18:10 |
End Date |
11/03/2024 ( Expired 452 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sw i : bengaluru - salem section : deepscreening work of 14.65 km length at km 205/350-220/000 sl, in connection with the work of sbc-sa section : ctr(p) of exg. 52kg/90 uts rails on 52kg psc sleepers of 1540 nos/km with 60kgs/90 uts rails on 60kg psc sleepers of 1660 nos/km for a length of 14.65 km from km 205/350-220/000 sl in den/south/sbc section sw ii : bengaluru - salem section : through sleeper renewal for a length of 1 km from 110/500-118/000 (scattered locations) in aden/dharmapuri se
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreSw i : yelahanka - rajanakunte : pro. construction of goomties at lc 20 between km 23/000-100. sw ii : construction of rcc drain for a length of 2160m in connection with the work of bengaluru -sampige road and bangalore - dharmavaram sec: through turnout renewal (ttr) of existing curved switch and cms crossing with 60 kg tws and 60 kg weldable crossing - 1in12 - total : 48 nos in sbc-spgr section in aden/yeswanthpur section and through ballast recoupment (tbr) of points and crossings - 13 nos
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : sw i : collection and supply of ballast at makajapalli (mkj) depot (quantity : 21,540 cum) including leading and loading in connection with the work of (i) through ballast recoupment of points and crossings - 4 points at orh yard and 5 points at mkl yard (total - 9 nos). (ii) through turnout renewal of existing 1in12 curved switch and cms crossing with tws and weldable cms crossing - 08 nos at ynk yard (100 a, 101 a, 102 b, 103 a, 104 a, 105 a, 105 b, 106 b). (iii) thro
For complete deion and other details, please refer to tender
Read more[i] bypl-dmm section- ohe modifications in connection with construction of foot over bridge (fob) at km 24/600/700 at rajanukunti (rnn) yard near rob no.497-a for pedestrian movement (3m wide & 4 track crossing). [ii]ohe modification in bangalore city - dharmavaram - ttr (twswcmsc) - 8 nos at ynk yard. [iii] ohe modification required for construction of track machine siding at repi, sspn and tdv station length of 420m [iv]ohe modifications in connection with engineering track works in sbc
For complete deion and other details, please refer to tender
Read moreBangalore - jolarpettai section: sw-i: increasing of sleeper density of existing psc from 1540 sleepers/km to 1660 sleeper/km on up line at km 220/700-231/300 and 240/200-251/000 for a length of 21.4km in den/e/sbc section. sw-ii: bangalore -jolarpettai section: through ballast recoupment in points and crossings for 12nos.
For complete deion and other details, please refer to tender
Read moreSw i : baiyappanahalli - dharmavaram section : construction of foot over bridge (fob) at km 24/600-700 at rajanukunte (rnn) yard near rob no. 498-a for pedestrian movement (3m wide and 4 track crossing) as per rdso drg. no. b-10405. sw ii : bengaluru - arsikere section : proposed foot over bridge (fob) at muddalinganahalli (mdll) station at km 44/050. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road section : proposed construction of rcc drain in connection with the work of through ballast recoupment of points and crossings - 6 points in dodbele (dbl) yard and 4 points in hirehalli (hhl) yard (total 10 nos.,) . sw ii : bengaluru - sampige road sec : construction of balance retaining wall, approach road etc., of rub in lieu of lc-37 at km 64/200-300 in kyatsandra (kiat) station yard. sw iii : yelahanka - chintamani section : proposed improvement
For complete deion and other details, please refer to tender
Read moreSw i : manufacturing, supply and stacking of machine crushed track ballast including leading and loading at periya naga thunai (prnt) depot (quantity = 21,150 cum) in connection with the work of (a) bengaluru-salem section : increasing sleeper density of existing 52kg psc sleepers of 1310/km to 1540/km for a length of 9.565km in loop lines of aden/dharmapuri, (b) chikka banavara - hassan section : through ballast recoupment of points and crossings at nelamangala (nmga) yard - 08 nos., (c) thro
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road section : manufacturing, supply, including leading and loading of ballast at nittur (ntr) depot (quantity : 20334 cum), in connection with the work of (a)through ballast recoupment of points and crossings - 6 points in dodbele (dbl) yard and 4 points in hirehalli (hhl) yard, (b) through ballast recoupment for a length of 3.3km from 42/500-46/800 in yelahanka - chikkaballapur section and bengaluru - arsikere and bengaluru - dharmavaram section : through bal
For complete deion and other details, please refer to tender
Read moreof your Industry type