Tender Details
Particulars | Details |
---|---|
Title |
Baiyappanahalli Dharmavaram Section: Replacement Of Rcc Slabs Of Span 2 X 11.755 Mtr With Psc Slabs For Up Line For Rub No. 516 A At Km 15/452 Between Channasandra (Csdr) Yelahanka (Ynk) And For Dn Line Between Yesvanthpur (Ypr) Yelahanka (Ynk) At Km 17/300 400 With Psc Slabs. Maintenance Period Is 6 Months
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79421170 |
Reference Number |
01SBC25OF07-01-25Item-11 |
Tender Fee | 0 |
EMD | 2.65 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79421170/viewNitPdf_4826878.pdf |
Start Date | January 08, 2025 00:16 |
End Date |
03/02/2025 ( Expired 77 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2 lane rob in lieu of lc no.38 at km 65/300-400 with 1x42m bowstring girder ( railway portion) 08x18.71m psc girder towards nh-73 baddihalli side and 5x18.71m psc girder towards nh-43 side and retaining wall on both sides of rob merging lengths between kyathasandra and tumakur stations including electrical works (composite work).
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreBaiyappanahalli - dharmavaram section: replacement of rcc slabs of span 2 x 11.755 mtr with psc slabs for up line for rub no. 516-a at km 15/452 between channasandra (csdr) - yelahanka (ynk) and for dn line between yesvanthpur (ypr) - yelahanka (ynk) at km 17/300-400 with psc slabs. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreHyderabad division - (1) sc-dhne section: pasr - additional loop line with simulataneous reception & despatch facility, (2) sc-dhne section: proposed construction of road under bridge (rub) in lieu of lc no: 33 at km 69/0-100 between shnr-babr stations, (3) sc-dhne section: elimination of manned level crossing gate no 65 at km 122/200-300 by providing rub between mbnr-mqn stations, (4) sc-dhne section: elimination of manned level crossing gate no. 141 at km 258/600-700 by providing rub be
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.35 at km. 62/400-500 with 1x60m bowstring girder (railway portion) 10x18.71m psc girder24.945 mtr psc solid slab towards nh-48 side and 6x18.71m psc girder1x16.33 mtr psc solid slab towards mydala side and retaining wall on both sides of rob merging lengths between kyathasandra and nidavanda stations and construction of lhs in lieu of lc 35 at km 62/400-500 as 1x5.5x2.5m rcc box including electrical works- composite work.
For complete deion and other details, please refer to tender
Read moreReplacement of existing steel girders bridges nos. with psc slab of 12.20m span of br.no.216 up & dn (2x6x12.20m) at km.157/3-7 & 157/8-4 ,br.no.227up & dn (2x5x12.20m) at km.183/17-21 & 183/22-18 ,br.no.229 up(5x12.20m) at km 186/5-9 & dn (7x12.20m) at km.186/10-06 in section of sse/w/kkde & br. no. 168 up & dn (1x9.15 mtr skew) , br no 176a dn (4x12.20m) at km.112/8-6 & br.no.208 up & dn (2x3x12.20m) at km 141/27-29 & 141/28-30 of 12.20m ,67a ,7
For complete deion and other details, please refer to tender
Read moreBengaluru-dharmavaram section: construction of rcc side drain for a length of 1200m in connection with the work of complete track renewal(p) of existing 60kg rails on 60kg psc with 60kg 90uts rails on 60kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn & 56/134-58/100 up between oddarahalli - thondebhavi station in sse/pway/hup section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru -sampige road sec: earthwork in connection with the work of compete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts rails and 60 kg wider base sleeper of 1660/km for a length of 17.15 km from km 17/650-10/500 and 39/000-49/000 dn line in aden/yeswanthpur section. sw ii : bengaluru -sampige road sec: earthwork in connection with the work of complete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts ra
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru -sampige road sec : complete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 17.15 km from km 17/650 - 10/500 and 39/000 - 49/000 dn line in aden/ypr section. sw ii : bengaluru -sampige road sec : complete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper 1660/km for a length of 21.35 km from km 17/650 - 39/000 u
For complete deion and other details, please refer to tender
Read moreVijayawada division: sw-i: trr(p) of exg. 60kg/90uts rails on psc6 sleepers 1660 density with new 60kg/r260 rails (lwr) for a total length of 4.20 km between gdr - bza & ki-bza sections. sw-ii: (i) tfr(a/f): through renewal of fittings on psc sleeper track from km 429.600- 431.400 on dn line for a total length of 1.800 km between bza-vskp section, (ii): gj:- through renewal of glued joints for a total of 43 nos. (60kg) at various locations between ki -bza section, (iii): ttr (rails)
For complete deion and other details, please refer to tender
Read moreof your Industry type