Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐ Procurement Opportunity For Bridge Infrastructure Upgrades ๐ ๏ธ The Ministry Of Railways, Central Government, Invites Bids For The Significant Project Of Upgrading Bridge Infrastructure On The Baiyappanahalli Dharmavaram Section And The Bengaluru Mysuru Section. ๐ ๐ Project Scope: Replacement Of A Steel Girder With A Psc Slab For Bridge No. 490 (1x12.20m) At Km 29/800 900 Between Rajanukunte And Dodballapur Stations. Replacement Of Steel Girders With Psc Slabs For Bridge No. 448 At Km 8/398 Between Nayandahalli (Nyh) And Jnana Bharati Halt (Gnb) Stations. ๐๏ธ Bid Submission Deadline: April 29, 2024, 3:00 Pm ๐ธ Earnest Money Deposit (Emd): Inr 21,00,000 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And A Maintenance Plan For A Period Of 6 Months Or One Monsoon Period, Whichever Is Later. Keywords: Bridge Infrastructure, Railway, Ministry Of Railways, Civil Construction, Psc Slab, Steel Girder, Tender, Government Contract, Emd, Procurement| Particulars | Details |
|---|---|
| Title |
Sw I: Replacement Of Steel Girder With Psc Slab For Bridge No. 490 (1x12.20m) At Km 29/800 900 Between Rajanukunte And Dodballapur Stations Of Baiyappanahalli Dharmavaram Section.
Sw Ii: Replacement Of Steel Girder With Psc Slabs Of Size Above 9.15m And Up To 12.20m Span Bridges For Bridge No. 448 At Km 8/398 Between Nayandahalli (Nyh) Jnana Bharati Halt (Gnb) Stations Of Bengaluru Mysuru Section. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74469342 |
|
Reference Number |
07SBC24of03-04-24Item-10 |
| Tender Fee | 0 |
| EMD | 2.1 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74469342/viewNitPdf_4527251.pdf |
| Start Date | April 03, 2024 21:20 |
| End Date |
Expired
29/04/2024
Expired 902 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreShoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast
Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast
Read more1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
Read moreSw i: replacement of steel girder with psc slab for bridge no. 490 (1x12.20m) at km 29/800-900 between rajanukunte and dodballapur stations of baiyappanahalli - dharmavaram section. sw ii : bengaluru - tumakuru : strengthening of bridge no. 268 at km 93/000-200 in aden/yesvanthpur subdivision. sw iii : proposed fixing of sign boards on approaches of bridges ie., br. no. 535 up, 516 up, 490, 480, 434, 319, 288, 285, 281, 268, 266, 259, 224, 214 and 197 of baiyappanahalli (bypl) - dharmavaram
For complete deion and other details, please refer to tender
Read moreReplacement of panel interlocking with electronic interlocking system at nayandahalli(nyh), hejjala(hjl), bidadi(bid), chennapatna (cpt) and mysuru new goods terminus (mngt) stations in connection with provision of automatic signalling system in ksr
Replacement of panel interlocking with electronic interlocking system at nayandahalli(nyh), hejjala(hjl), bidadi(bid), chennapatna (cpt) and mysuru new goods terminus (mngt) stations in connection with provision of automatic signalling system in ksr
Read moreProposed construction of rob at km.608/400-500 in lieu of lc no.382 1x30m bow string girder (railway portion) 1x30m psc girder 7x18m psc girder & deck slab (approach portion) between desur and belagavi stations
For complete deion and other details, please refer to tender
Read moreConstruction of road over bridge with subway in lieu of level crossing no.86 as 1x30m composite girder with 8x18m psc girder towards hassan side and 8x18m psc girder towards nh side at railway km.142/700-800 between tiptur and honnavalli road stations in tumakuru- arsikere section.(composite work).
For complete deion and other details, please refer to tender
Read moreScr construction organisation - doubling of track between guntur-guntakal section - proposed construction of major bridges (br.no.221 - 7x18.30 psc girder, br.no.220 - 2x12.20 psc slab, br.no.219 - 3x6.10 psc slab, br.no.217 - 5x6.10 psc slab, br.no.215 - 4x6.10 psc slab, br.no.210 - 9x6.10 psc slab,br.no.207 - 4x12.20 psc slab) for accommodating double line between nandyal and betamcherla stations.
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.58 ( manned) at km:95/850 with 1x30m composite girder with 23x18.71m psc girder (nittur end) 8x18.71m psc girder (harnahalli end) rcc retaining wall (approach span) and construction of limited high sub-way of size 5.5x2.5m between nittur-gubbi stations. (composite work).
For complete deion and other details, please refer to tender
Read moreof your Industry type