Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cs For Development Of Standard Design And Drawings For Superstructure With Precast Post Tensioned Psc I Girder / Precast Rcc I Girder / Cast In Situ Rcc T Beam For Highway/ Expressway Bridges Including Proof Checking By Iit
|
| Description |
Cs For Development Of Standard Design And Drawings For Superstructure With Precast Post Tensioned Psc I Girder / Precast Rcc I Girder / Cast In Situ Rcc T Beam For Highway/ Expressway Bridges Including Proof Checking By Iit
|
| Organisation | National Highways Authority of India | Head Office - NHAI | Technical - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 5000 |
| EMD | 4 Lakh |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 16, 2026 19:30 |
| End Date |
Open
10/11/2026
24 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ssi, design and const of 55 m major pmt bridge with open foundation and psc box girder superstructure proposed over pareng khola river at km 23.980,excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf under (p) swtk state wb
Ssi, design and const of 55 m major pmt bridge with open foundation and psc box girder superstructure proposed over pareng khola river at km 23.980,excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf under (p) swtk state wb
Read moreOhe modification work in connection with replacement of existing steel girder by precast psc slab under aden (an) jurisdiction (total 70 spans) in udhna-jalgaon section of mumbai division.
Ohe modification work in connection with replacement of existing steel girder by precast psc slab under aden (an) jurisdiction (total 70 spans) in udhna-jalgaon section of mumbai division.
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreSsi, design and constr of 60 m major pmt bridge with open foundation and psc box girder superstructure proposed over jhalong khola river at km 23.20, excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf (p) swtk in state w b
Ssi, design and constr of 60 m major pmt bridge with open foundation and psc box girder superstructure proposed over jhalong khola river at km 23.20, excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf (p) swtk in state w b
Read moreReplacement of girder/slab/rail cluster with psc slab/rcc box of br. no. 124adn, 125dn, 139dn, 16dn, 30 & 196 in the jurisdiction of sr.den-iii/lko.
Replacement of girder/slab/rail cluster with psc slab/rcc box of br. no. 124adn, 125dn, 139dn, 16dn, 30 & 196 in the jurisdiction of sr.den-iii/lko.
Read more1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
Read moreSsi, design including proof check of design and drawings and construction of 40 mtr span irc 70r psc box girder superstructure pmt bridge on open foundation over lingtham khola at km 30.00 on rishi-rongli-kupup road under 130 rcc
Ssi, design including proof check of design and drawings and construction of 40 mtr span irc 70r psc box girder superstructure pmt bridge on open foundation over lingtham khola at km 30.00 on rishi-rongli-kupup road under 130 rcc
Read moreConstruction of boundary wall with precast psc panel & precast psc column and precast rcc footing & column cap along railway track between rmu-lku section in izn division.
For complete deion and other details, please refer to tender
Read moreConstr of 30 m single span major pmt br with psc box girder with open fdn including proof checking of design and drawings at km 51.700 on kohima pedi peren road under 89 rcc/15 brtf/project sewak in nagaland state
Constr of 30 m single span major pmt br with psc box girder with open fdn including proof checking of design and drawings at km 51.700 on kohima pedi peren road under 89 rcc/15 brtf/project sewak in nagaland state
Read moreof your Industry type