Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sw I: Penukonda Dharmavaram Section: Complete Track Renewal (Primary) For A Length Of 0.6 Kms From 0/000 To 0/600 At Penukonda Yard Road 1 (Sspn Line) And Through Turnout Renewal (Primary) Of Point Number 62 A At Pkd Yard Between Km 0/180 0/240 (1 Set) In Sse/Pway/Pkd Section.
Sw Ii : Bengaluru Dharmavaram Section : Through Fittings Renewal For A Length Of 15.4 Km From Km 56/700 To 72/100 Dn Line In Sse/Pway/Hup Section.
Sw Iii : Yelahanka Chintamani Section : Replacement Of Over Aged
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 83937570 |
|
Reference Number |
20SBC25OF03-09-25ITEM-07 |
| Tender Fee | 0 |
| EMD | 1.15 Lakh |
| Tender Value | |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102025/83937570/viewNitPdf_5091445.pdf |
| Start Date | September 03, 2025 20:59 |
| End Date |
Expired
06/10/2025
Expired 263 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreSw-i: bengaluru - dharmavaram section: increasing sleeper density of existing 52 kg psc sleepers of 1310/km to 1540/km for a length of 4.2 km in loop lines of sse/pway/yelahanka section [channasandra (csdr) : rd-1, rd-3 & rd-4, yelahanka (ynk) : rd-1 and rd-2 in sr den/north/sbc section]. sw-ii: bengaluru - sampige road section: through ballast recoupment of points & crossings - 6 points in dodbele (dbl) yard and 4 points in hirehalli (hhl) yard - (total 10 nos). sw-iii: bengaluru - sa
For complete deion and other details, please refer to tender
Read moreYelahanka - chintamani section: cess repair and widening of formation of isolated locations for a length of 13.55 km from 1/600 to 75/200 (sl) in sse/pway/ynk section. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: through fitting renewal (tfr) for a length of 27.15kms from km 43/600-65/390, 91/760-93/570 and 99/650-101/200 (down line) and 43/600-45/210, 54/610-55/000 (up line). sw-ii: bengaluru - mysuru section: through turnout renewal (ttr) of existing 52kg curved switch and cms crossing with 60kg curved switch and cms crossing - total 10 sets (1 in 8.5) at nyh, kgi and hjl yards. sw-iii: bengaluru - mysuru section: through turnout renewal (ttr) of existing 52kg curved
For complete deion and other details, please refer to tender
Read moreSwi:-vpt-mej (up/dn) & mej-ten (up line) section:-complete track renewal (primary) by using pqrs/sqrs train for a length of 31.107kms in sse/p.way/ten and tn section (ten-14.057km ,tn-17.050km) sw ii:-complete track renewal (primary) for a length of 0.60 kms manual at nrk platform portion in sse/p.way/ten section and pqrs/sqrs siding for a length of 350m at mvn yard in sse/p.way/tn section.
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - dharmavarm section : through turnout renewal of existing curved switch, cms crossing, psc sleepers with 60 kg tws, 60 kg weldable cms crossing and 60 kg psc fan shaped layout (1in12 - 34 numbers and 1in8.5 - 4 numbers) total 38 numbers in sse/pway/hindupur section. sw ii : bengaluru - sampige road section : through turnout renewal of existing curved switch, cms crossing and psc sleepers with 60kg tws and 60kg weldable cms crossing and 60kg psc fan shaped layout - 1in12 - to
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road section : proposed construction of rcc drain in connection with the work of through ballast recoupment of points and crossings - 6 points in dodbele (dbl) yard and 4 points in hirehalli (hhl) yard (total 10 nos.,) . sw ii : bengaluru - sampige road sec : construction of balance retaining wall, approach road etc., of rub in lieu of lc-37 at km 64/200-300 in kyatsandra (kiat) station yard. sw iii : yelahanka - chintamani section : proposed improvement
For complete deion and other details, please refer to tender
Read moreSenior section engineer/ permanent way/ tirunelveli section:-(sw i):-vanchimaniyachchi-tirunelveli ( dn line) section:- complete track renewal (primary) by manual at isolated locations between km:-0.640 to 15.420 for a length of 2.220 kms in between stations vanchimaniyachchi and talaiyuthu. (sw ii):- vanchimaniyachchi-tirunelveli ( dn line) section:- proposed through rail renewal (primary) at isolated locations between km:- 1.540 to 13.860 for a length of 1.810 kms in between stations vanc
For complete deion and other details, please refer to tender
Read moreBengaluru-dharmavaram section: construction of rcc side drain for a length of 1200m in connection with the work of complete track renewal(p) of existing 60kg rails on 60kg psc with 60kg 90uts rails on 60kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn & 56/134-58/100 up between oddarahalli - thondebhavi station in sse/pway/hup section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreBengaluru-dharmavaram section: construction of rcc side drain for a length of 1200m in connection with the work of complete track renewal(p) of existing 60kg rails on 60kg psc with 60kg 90uts rails on 60kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn and 56/134-58/100 up between oddarahalli - thondebhavi station in sse/pway/hup section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreof your Industry type