Tender Details
Particulars | Details |
---|---|
Title |
Bengaluru Dharmavaram : Cess Repair And Widening Of Formation (Up/Dn Lines) At Isolated Locations And Construction Of Rcc Drain For A Length Of 1600m In Connection With The Work Of Cess Repair And Widening Of Formation (Up/Dn Lines) At Isolated Locations 39.615 Km From 36/250 101/200 Up &Amp Dn Lines. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77874189 |
Reference Number |
24SBC24OF09-10-2024Item-1 |
Tender Fee | 0 |
EMD | 6.42 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77874189/viewNitPdf_4738259.pdf |
Start Date | October 10, 2024 18:14 |
End Date |
04/11/2024 ( Expired 168 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bangalore -jolarpettai section: replacement of steel girders with psc slabs (1x11.52m) for bridge no. 838/b up and down line at km. 347/500-600 between bengaluru east (bnce) - byappanahalli (bypl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreBengaluru-dharmavaram section: construction of rcc side drain for a length of 1200m in connection with the work of complete track renewal(p) of existing 60kg rails on 60kg psc with 60kg 90uts rails on 60kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn & 56/134-58/100 up between oddarahalli - thondebhavi station in sse/pway/hup section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreDen/south/sbc sec : cess repair/widening work in connection with the work of (a) sbc-sa sec : complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60 kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dpj section. (b) baw-has : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru salem section : sw i : slope stabilization by widening of slopes of cuttings from km 51/940-52/100, 52/550-800, 52/900-53/040 in sse/pway/dharmapuri (south) section. sw ii : slope stabilization by widening of slopes in cuttings from km 111/000-112/400, 127/630-800, 129/400-130/000 and 137/100-200 in aden/dharmapuri section. maintenance period is 6 months or one monsoon period whichever is later. (two packet system)
For complete deion and other details, please refer to tender
Read moreBangalore - mysore section: construction of rrm drain and ballast retaining wall 1000m in connection with the work of complete track renewal (ctr(p)) of existing 52kg rails with 60kg for a length of 28.30kms from 13/500-30/000 and 31/800 - 43/600 up line in sse/p.way/kgi section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreBengaluru - dharmavaram : cess repair and widening of formation (up/dn lines) at isolated locations and construction of rcc drain for a length of 1600m in connection with the work of cess repair and widening of formation (up/dn lines) at isolated locations - 39.615 km from 36/250-101/200 up & dn lines. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreSw-i: bengaluru - salem sec: strengthening of bank by providing standard width in isolated locations for a length of 18.85km from km 145/650-165/600 sl in aden/dharmapuri section. sw-ii: bengaluru - salem sec: cess work in connection with the work of through ballast recoupment of points and crossings at dharmapuri (dpj), rayakkottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards-total 11 nos in aden/dharmapuri section. maintenance period is 6 months or one mo
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: strengthening of bank by providing standard width and improving drainage at isolated locationsfrom km 216/000-238a/000 up and down line for 8.66kms and 289/100-302/600 up and down for 5.653kms (total length - 14.313kms). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type