Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Bengaluru Dharmavaram : Cess Repair And Widening Of Formation (Up/Dn Lines) At Isolated Locations And Construction Of Rcc Drain For A Length Of 1600m In Connection With The Work Of Cess Repair And Widening Of Formation (Up/Dn Lines) At Isolated Locations 39.615 Km From 36/250 101/200 Up &Amp Dn Lines. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77874189 |
Reference Number |
24SBC24OF09-10-2024Item-1 |
Tender Fee | 0 |
EMD | 6.42 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77874189/viewNitPdf_4738259.pdf |
Start Date | October 10, 2024 18:14 |
End Date |
04/11/2024 ( Expired 243 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sw-i- manmad - mudkhed (up/dn) - cess repair - 86700 cum & akola - purna - cess repair - 40000 cum( irpsm id-11.0.31.24.3.53.010 pb no. 157 of fy 2024-25) sw-ii - nanded division - manmad-mudkhed (up& sl) section : ctr(p) of exg. 60kg/90uts rails on psc6 sleepers 1660nos/km density with new 60kg r260 grade rails (lwr) on new wider psc sleepers 1660 nos./km including recoupment and increasing of ballast cushion to 35 cm. and deep screening of ballast for a total length of 15.317 km. (sa
For complete deion and other details, please refer to tender
Read moreSw-i- manmad - mudkhed (up/dn) - cess repair - 86700 cum & akola - purna - cess repair - 40000 cum( irpsm id-11.0.31.24.3.53.010 pb no. 157 of fy 2024-25) sw-ii - nanded division - manmad-mudkhed (up& sl) section : ctr(p) of exg. 60kg/90uts rails on psc6 sleepers 1660nos/km density with new 60kg r260 grade rails (lwr) on new wider psc sleepers 1660 nos./km including recoupment and increasing of ballast cushion to 35 cm. and deep screening of ballast for a total length of 15.317 km. (sa
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: through ballast recoupment for a length of 43.20kms from km 62/000 - 101/700 on up and km 81/750-85/250 down line. sw-ii: through ballast recoupment - 0.8ikm (loop lines) and 16 nos. points and crossings.
For complete deion and other details, please refer to tender
Read moreProposed strengthening of high embankment and cess repair between ajni- nagpur section on dn road kms 834.44-835.70=1.20kms excluding ghat road bridge portion under sse(p.way)ngp length and improvement of drainage at ajni yard by removing debris near fci shunting neck and up ml under aden(s)ngp sub division.
For complete deion and other details, please refer to tender
Read moreBengaluru-dharmavaram section: construction of rcc side drain for a length of 1200m in connection with the work of complete track renewal(p) of existing 60kg rails on 60kg psc with 60kg 90uts rails on 60kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn & 56/134-58/100 up between oddarahalli - thondebhavi station in sse/pway/hup section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreDen/south/sbc sec : cess repair/widening work in connection with the work of (a) sbc-sa sec : complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60 kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dpj section. (b) baw-has : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBangalore - mysore section: construction of rrm drain and ballast retaining wall 1000m in connection with the work of complete track renewal (ctr(p)) of existing 52kg rails with 60kg for a length of 28.30kms from 13/500-30/000 and 31/800 - 43/600 up line in sse/p.way/kgi section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: through ballast recoupment for a length of 43.20kms from km 62/000 - 101/700 on up and km 81/750-85/250 down line. sw-ii: through ballast recoupment - 0.8ikm (loop lines) and 16 nos. points and crossings.
For complete deion and other details, please refer to tender
Read moreBengaluru - dharmavaram : cess repair and widening of formation (up/dn lines) at isolated locations and construction of rcc drain for a length of 1600m in connection with the work of cess repair and widening of formation (up/dn lines) at isolated locations - 39.615 km from 36/250-101/200 up & dn lines. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type