Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Yelahanka Chintamani Section: Cess Repair And Widening Of Formation Of Isolated Locations For A Length Of 13.55 Km From 1/600 To 75/200 (Sl) In Sse/Pway/Ynk Section. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 83937422 |
|
Reference Number |
20SBC25OF03-09-25ITEM-06 |
| Tender Fee | 0 |
| EMD | 2.6 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102025/83937422/viewNitPdf_5091456.pdf |
| Start Date | September 03, 2025 20:51 |
| End Date |
Expired
06/10/2025
Expired 374 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreBengaluru - dharmavaram : cess repair and widening of formation (up/dn lines) at isolated locations and construction of rcc drain for a length of 1600m in connection with the work of cess repair and widening of formation (up/dn lines) at isolated locations - 39.615 km from 36/250-101/200 up & dn lines. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : strengthening of bank by providing standard width and improving drainage at isolated locations from 3/870 to 79/530 (sl) for a length of 16.65 km. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read morePlucking of coconut from block i for a period of one year from the date of sanction or signing contract agreement whichever is later
As per rfp
Read morePlucking of coconut from block ii for a period of one year from the date of sanction or signing contract agreement whichever is later
As per rfp
Read moreBaiyappanahalli - dharmavaram section: replacement of rcc slabs of span 2 x 11.755 mtr with psc slabs for up line for rub no. 516-a at km 15/452 between channasandra (csdr) - yelahanka (ynk) and for dn line between yesvanthpur (ypr) - yelahanka (ynk) at km 17/300-400 with psc slabs. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : slope stabilization by widening of slopes of cuttings from km 50/000-100, 50/800-51/050, 51/300-500, 51/760-880 in sse/pway/tpp between muttampatti (mpc) and sivadi (szv) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : re-profiling and protection of slope by providing turfing at km 39/100-41/400. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: strengthening of bank by providing standard width and improving drainage at isolated locationsfrom km 216/000-238a/000 up and down line for 8.66kms and 289/100-302/600 up and down for 5.653kms (total length - 14.313kms). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreKsr bengaluru: provision of covered shelter and granite flooring at open area between platform - 7 and & at ksr bengaluru station. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type