Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Chikka Banavara Hassan Section : Re Profiling And Protection Of Slope By Providing Turfing At Km 39/100 41/400. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 83570742 |
|
Reference Number |
17SBC25OF11-08-25Item-09 |
| Tender Fee | 0 |
| EMD | 2.64 Lakh |
| Tender Value | |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/092025/83570742/viewNitPdf_5071766.pdf |
| Start Date | August 12, 2025 17:36 |
| End Date |
Expired
02/09/2025
Expired 300 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Chikka banavara - hassan section : construction of rub (rcc box size : 1 x 7.50 x 4.50m) at km 14/300-400 at nelamangala (nmga station) by rolling in / launching method. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : strengthening of bank by providing standard width and improving drainage at isolated locations from 3/870 to 79/530 (sl) for a length of 16.65 km. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at railway km 20/750 near nelamangala station - rcc box size 1 x 5.0m x 4.25m by box pushing method - deposit work for yettinahole project division no. 4. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at rly km 20/750 near nelamangala station - rcc box size 1m x 5.0m x 4.25m by box pushing method (deposit work for yettinahole project division no. 4). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed extension of ballast depot (210m x 18m) and approach road (400m x 4.5m) at hirisave (hise) in aden/kigl sec, under den/south/sbc jurisdiction. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section: earhwork in connection with the work of ctr(p) for a length of 16km from 11/900-23/0 and 72/100-77/0 sl to replace d mark rails . sw ii : cess work in connection with the work of chikka banavara - hassan sec : through ballast recoupment of points and crossings at nelamangala yard - 08 numbers . maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru division : replacement of steel girder for bridge no. 422 at km 0/800-900 (b-line and shunting neck) between bengaluru (sbc) - yesvanthpur (ypr) section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreBengaluru salem section : sw i : slope stabilization by widening of slopes of cuttings from km 51/940-52/100, 52/550-800, 52/900-53/040 in sse/pway/dharmapuri (south) section. sw ii : slope stabilization by widening of slopes in cuttings from km 111/000-112/400, 127/630-800, 129/400-130/000 and 137/100-200 in aden/dharmapuri section. maintenance period is 6 months or one monsoon period whichever is later. (two packet system)
For complete deion and other details, please refer to tender
Read moreYelahanka - chintamani section: cess repair and widening of formation of isolated locations for a length of 13.55 km from 1/600 to 75/200 (sl) in sse/pway/ynk section. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru division : replacement of steel girder for bridge no. 422 at km 0/800-900 (b-line and shunting neck) between bengaluru (sbc) - yesvanthpur (ypr) section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreof your Industry type