Tender Details
Particulars | Details |
---|---|
Title |
Chikka Banavara Hassan Section : Proposed New Bridge No. 39 A At Railway Km 20/750 Near Nelamangala Station Rcc Box Size 1 X 5.0m X 4.25m By Box Pushing Method Deposit Work For Yettinahole Project Division No. 4. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79086974 |
Reference Number |
01SBC25OF07-01-25Item-01 |
Tender Fee | 0 |
EMD | 2.78 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79086974/viewNitPdf_4810183.pdf |
Start Date | January 07, 2025 23:48 |
End Date |
03/02/2025 ( Expired 77 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Chikka banavara - hassan section : proposed extension of ballast depot (210m x 18m) and approach road (400m x 4.5m) at hirisave (hise) in aden/kigl sec, under den/south/sbc jurisdiction. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at railway km 20/750 near nelamangala station - rcc box size 1 x 5.0m x 4.25m by box pushing method - deposit work for yettinahole project division no. 4. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreConstruction of rub/lhs (size 2.5 x 2.5 m ) in lieu of lc no. 42 at ir chainage 76/18-20 between saphale-kelve road stations of vaitarna-surat section of mumbai division of western railway in connection with western dedicated freight corridor: by box pushing method
For complete deion and other details, please refer to tender
Read more1. sw-i sc division: kzj-bza section - provision of additional vent way to bridge no. 569 a (up & dn line portion) as precast rcc box of size 2 x 5.50x3.00m at km 430/10-12 between kesamudram - tadalapusapalli stations by air pushing method using 20.40m rh girder. 2. sw-ii sc division: kzj-bza section - provision of additional vent way to bridge no. 569 b (up & dn line portion) as precast rcc box of size 2 x 5.50x3.00m at km 430/18-20 between kesamudram - tadalapusapalli station
For complete deion and other details, please refer to tender
Read moreConstruction of canal bridge (rcc twin box 2 x 4.25m x 4m) as deposit work at canal chainage km 51.400 main canal of pkg no 16 in kaleshwaram project crossing/intersecting nh 163 at km 51/520 by open cut method along with provision of di roads
Construction of canal bridge (rcc twin box 2 x 4.25m x 4m) as deposit work at canal chainage km 51.400 main canal of pkg no 16 in kaleshwaram project crossing/intersecting nh 163 at km 51/520 by open cut method along with provision of di roads
Read moreChikka banavara - hassan section : through rail renewal (primary) 0.95km length from 13/055-14/005 (sl) and through turnout renewal of point no. 51b (cscmsc) at nelamangala (nmga) yard
For complete deion and other details, please refer to tender
Read moreBengaluru division : replacement of steel girder for bridge no. 422 at km 0/800-900 (b-line and shunting neck) between bengaluru (sbc) - yesvanthpur (ypr) section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreConstruction of rub of internal size 2 x 5.0m x 5.0m (twin rcc box from dana mandi to chowki kot mit singh) at railway track km 6.934 on asr-kemk section by pushing method in the section under aden - ii / asr
For complete deion and other details, please refer to tender
Read moreSw i: replacement of steel girder with psc slab for bridge no. 490 (1x12.20m) at km 29/800-900 between rajanukunte and dodballapur stations of baiyappanahalli - dharmavaram section. sw-ii: replacement of steel girder with psc slabs of size above 9.15m and up to 12.20m span bridges for bridge no. 448 at km 8/398 between nayandahalli (nyh) - jnana bharati halt (gnb) stations of bengaluru - mysuru section. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreWidening of bridge no. 39 from existing arch bridge of 4 width to rcc box of 3m x 2.5m or as per final design by cut and cover method and construction of bypass spillover rcc drain of approximate dimension 2.5m x 1.0m x 200m. in the section of sse/w/hw under aden/hw. (estt. no. 23/2024 rrsk)
For complete deion and other details, please refer to tender
Read moreof your Industry type