Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Chikka Banavara Hassan Section : Construction Of Rub (Rcc Box Size : 1 X 7.50 X 4.50m) At Km 14/300 400 At Nelamangala (Nmga Station) By Rolling In / Launching Method. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 83779865 |
|
Reference Number |
18SBC25OF19-08-25Item-01 |
| Tender Fee | 0 |
| EMD | 4.51 Lakh |
| Tender Value | |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/092025/83779865/viewNitPdf_5081758.pdf |
| Start Date | August 19, 2025 22:59 |
| End Date |
Expired
10/09/2025
Expired 290 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Chikka banavara - hassan section : through rail renewal (primary) 0.95km length from 13/055-14/005 (sl) and through turnout renewal of point no. 51b (cscmsc) at nelamangala (nmga) yard
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at railway km 20/750 near nelamangala station - rcc box size 1 x 5.0m x 4.25m by box pushing method - deposit work for yettinahole project division no. 4. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at rly km 20/750 near nelamangala station - rcc box size 1m x 5.0m x 4.25m by box pushing method (deposit work for yettinahole project division no. 4). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : re-profiling and protection of slope by providing turfing at km 39/100-41/400. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed extension of ballast depot (210m x 18m) and approach road (400m x 4.5m) at hirisave (hise) in aden/kigl sec, under den/south/sbc jurisdiction. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: rub in lieu of lc no. 16 at km 17/500-600 rcc box of size 2 x 5.00m x 5.00m by rolling/launching method in aden/mandya sub division. maintenance period is 6months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section: earhwork in connection with the work of ctr(p) for a length of 16km from 11/900-23/0 and 72/100-77/0 sl to replace d mark rails . sw ii : cess work in connection with the work of chikka banavara - hassan sec : through ballast recoupment of points and crossings at nelamangala yard - 08 numbers . maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSw i : chikka banavara - hassan sec : construction of boundary wall at nelamangala (nmga) at km 13/300-14/000, kunigal (kigl) at km 58/200-550 on lhs and rhs, yediyuru (yy) at km 75/800-76/200 on lhs and rhs and b g nagar (bgnr) at km 90/000-550 on lhs stations in aden/kunnigal sub-division. sw ii : shravanabelogala (sbga) station : proposed construction of platform toilet at pf-1. sw iii : construction of rcc drain for a length of 1500m in connection with the work of bengaluru-salem sec
For complete deion and other details, please refer to tender
Read moreof your Industry type