Tender Details
About Tender
🚂 Procurement Notice: Chikka Banavara Hassan Section Rail Renewal 🛠️ The Ministry Of Railways, Central Government, Invites Bids From Experienced Contractors For The Rail Renewal Project At Chikka Banavara Hassan Section And The Renewal Of A Through Turnout At Nelamangala (Nmga) Yard. 🚉 📅 Bid Submission Deadline: June 20, 2024, 3:00 Pm The Project Scope Includes The Complete Deion Of The Track Over A Length Of 0.95 Km From Sl 13/055 To Sl 14/005 And The Renewal Of A Through Turnout At Point No. 51 B (Cscmsc). 🛤️ A Bid Security Of Inr 3,63,000/ Is Required With The Earnest Money Deposit (Emd). Interested Bidders Should Refer To The Tender Document For Detailed Specifications And Submission Guidelines. Keywords: Rail Renewal, Chikka Banavara Hassan Section, Turnout Renewal, Ministry Of Railways, Central Government Tender, Emd, Bid SubmissionParticulars | Details |
---|---|
Title |
Chikka Banavara Hassan Section : Through Rail Renewal (Primary) 0.95km Length From 13/055 14/005 (Sl) And Through Turnout Renewal Of Point No. 51 B (Cscmsc) At Nelamangala (Nmga) Yard
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75290026 |
Reference Number |
12SBC24OF28-05-24Item-4 |
Tender Fee | 0 |
EMD | 36300 |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/062024/75290026/viewNitPdf_4581778.pdf |
Start Date | May 28, 2024 18:50 |
End Date |
20/06/2024 ( Expired 305 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of c.c road from samsabad pmgsy road culvart to aihorani danesh rajbanshi land at length 125 meter and breadth 12ft of mahisbathani gp of old malda block (booth no.-14 ,jl no.- 13, mouza- aihorani, plot- , gp- mahisbathani, block- old ma
Construction of c.c road from samsabad pmgsy road culvart to aihorani danesh rajbanshi land at length 125 meter and breadth 12ft of mahisbathani gp of old malda block (booth no.-14 ,jl no.- 13, mouza- aihorani, plot- , gp- mahisbathani, block- old ma
Read moreSw i : bengaluru - salem section : proposed extension road surface at lc 143 in aden/dpj section. sw ii : chikka banavara - hassan section : construction of rcc side drain for a length of 750m in connection with the work of strengthening of bank by providing standard width and improving drainage at isolated locations from km 3/870 to 79/530 (sl) for a length of 16.65 km. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at railway km 20/750 near nelamangala station - rcc box size 1 x 5.0m x 4.25m by box pushing method - deposit work for yettinahole project division no. 4. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreSw i : chikbanavara - hassan section : through fitting renewal (without erc) for a length of 40.8 km from 124/000-164/800 (sl). sw ii : chikbanavara - hassan section : through ballast recoupment for a length of 110 km from 14/000-124/000 (sl)
For complete deion and other details, please refer to tender
Read moreConstruction of c.c road from samsabad pmgsy road culvart to aihorani danesh rajbanshi land at length 125 meter and breadth 12ft of mahisbathani gp of old malda block (booth no.-14 ,jl no.- 13, mouza- aihorani, plot- , gp- mahisbathani, block- old ma
Construction of c.c road from samsabad pmgsy road culvart to aihorani danesh rajbanshi land at length 125 meter and breadth 12ft of mahisbathani gp of old malda block (booth no.-14 ,jl no.- 13, mouza- aihorani, plot- , gp- mahisbathani, block- old ma
Read more1)complete track renewal (secondary) of existing 60 kg 90 uts rail on 60kg psc-12 sleeper with new 60 kg 90 uts rails on psc-14 sleepers for a length of 4.954 tkm at scmn route no.6&8, vskp-route no.10, ktv-route no.4 & 10 alm-route no.5 in yards under aden/track on waltair division. 2) through rail renewal (secondary) of existing 60 kg 90 uts rail on 60kg psc-12 sleeper with new 60 kg 90 uts rails on psc-14 sleepers for a length of 1,745 tkm at kpl yard- route no.4 & alm yar
For complete deion and other details, please refer to tender
Read moreHyderabad division: 1. secunderabad -dhone section (up, dn & sl): complete track renewal - ctr (secondary) for a length of 15.838 tkms and through rail renewal (secondary) - 2.542 tkms on yard lines 2. sc-dhne section: chord line: through sleeper renewal(p) for a length of 0.73 kms between stpd a and stpd b cabins.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : through rail renewal (primary) 0.95km length from 13/055-14/005 (sl) and through turnout renewal of point no. 51b (cscmsc) at nelamangala (nmga) yard
For complete deion and other details, please refer to tender
Read moreSw-i: through rail renewal (p) for a total length of 14.018 tkm in den/west/gnt section. sw-ii: complete track renewal (p) for a total length of 1.78 tkm in den/west/gnt section. sw-iii: complete track renewal(s) for a total length of 1.884 tkms in den/west/gnt section. sw-iv: through rail renewal (s) for a total length of 0.982 tkm in den/west/gnt section. sw-v: through sleeper renewal (p) for a length of 0.99 km in ndl yard rd no.4
For complete deion and other details, please refer to tender
Read moreSw i : manufacturing, supply and stacking of machine crushed track ballast including leading and loading at periya naga thunai (prnt) depot (quantity = 21,150 cum) in connection with the work of (a) bengaluru-salem section : increasing sleeper density of existing 52kg psc sleepers of 1310/km to 1540/km for a length of 9.565km in loop lines of aden/dharmapuri, (b) chikka banavara - hassan section : through ballast recoupment of points and crossings at nelamangala (nmga) yard - 08 nos., (c) thro
For complete deion and other details, please refer to tender
Read moreof your Industry type