Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Chikka Banavara Hassan Section : Proposed Extension Of Ballast Depot (210m X 18m) And Approach Road (400m X 4.5m) At Hirisave (Hise) In Aden/Kigl Sec, Under Den/South/Sbc Jurisdiction. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79365810 |
|
Reference Number |
01SBC25OF07-01-25Item-02 |
| Tender Fee | 0 |
| EMD | 2.04 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79365810/viewNitPdf_4824305.pdf |
| Start Date | January 07, 2025 23:50 |
| End Date |
Expired
03/02/2025
Expired 572 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Manufacturing, supply and stacking of machine crushed track ballast including leading and loading at hirisave (hise) depot (quantity = 12510 cum) in connection with the work of chikka banavara sec : through ballast recoupment for a length of 7.881 km in looplines of b g nagar (bgnr), hirisave (hise), shravanabelagola (sbga), channarayapatna (cnpa) and samudravalli (dsvs) yards
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : re-profiling and protection of slope by providing turfing at km 39/100-41/400. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreSw i : chikka banavara - hassan section : renewal of existing 52/60kg conventional sej to thick web sej - 40 numbers. sw ii : chikka banavara - hassan section : ttr (tws wcms) of existing 6 numbers of 1 in 12 and 1 number of 1 in 16 points with tws and wcms, total 7 sets at hirisave (hise) and channarayapatna (cnpa) yards in sse/pway/cnpa section. sw iii : chikka banavara - hassan section : ttr of existing 1 in 12 curved switch (5 numbers) and 1 in 16 curved switch (2 numbers) with tws, we
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : construction of rub (rcc box size : 1 x 7.50 x 4.50m) at km 14/300-400 at nelamangala (nmga station) by rolling in / launching method. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : strengthening of bank by providing standard width and improving drainage at isolated locations from 3/870 to 79/530 (sl) for a length of 16.65 km. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at railway km 20/750 near nelamangala station - rcc box size 1 x 5.0m x 4.25m by box pushing method - deposit work for yettinahole project division no. 4. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at rly km 20/750 near nelamangala station - rcc box size 1m x 5.0m x 4.25m by box pushing method (deposit work for yettinahole project division no. 4). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSw i : chikka banavara - hassan section : through ballast recoupment for a length of 7.881 km in looplines of b g nagar (bgnr), hirisave (hise), shravanabelagola (sbga), channarayapatna (cnpa) and samudravalli (dsvs) yards. sw ii : bengaluru - salem section : through ballast recoupment of points and crossing at dharmapuri (dpj), rayakottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards - total 11 nos in aden/dharmapuri section. sw iii : bengaluru - salem sec
For complete deion and other details, please refer to tender
Read moreBangalore - salem section and chikka banavara - hassan sec : supply, installation, commissioning and maintenance of track mounted automatic gauge face lubricators on 29 curves (sse/pway/hosur section) and 1 curve (sse/pway/channarayapatna) for period of 5 years in den/south section
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section: earhwork in connection with the work of ctr(p) for a length of 16km from 11/900-23/0 and 72/100-77/0 sl to replace d mark rails . sw ii : cess work in connection with the work of chikka banavara - hassan sec : through ballast recoupment of points and crossings at nelamangala yard - 08 numbers . maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type