Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Machine Crushed Track Ballast 🛤️ The Ministry Of Railways, Central Government, Invites Bids For The Manufacturing, Supply, And Stacking Of Machine Crushed Track Ballast For The Chikka Banavara Section, Specifically For The Ballast Recoupment Work On The Looplines Of B G Nagar (Bgnr), Hirisave (Hise), Shravanabelagola (Sbga), Channarayapatna (Cnpa), And Samudravalli (Dsvs) Yards In Hubli. 🚇 📅 Bid Submission Deadline: April 29, 2024, 3:00 Pm Tender Fee: Inr 0 Emd: Inr 2,25,200 Interested Bidders Are Advised To Review The Complete Tender Document For Detailed Specifications, Terms, And Conditions. This Project Involves The Supply Of 12,510 Cum Of Ballast And Includes Leading And Loading Services At The Hirisave (Hise) Depot. Keywords: Machine Crushed Track Ballast, Ministry Of Railways, Infrastructure, Government Tender, Railways Procurement, Ballast Recoupment, Hubli Depot| Particulars | Details |
|---|---|
| Title |
Manufacturing, Supply And Stacking Of Machine Crushed Track Ballast Including Leading And Loading At Hirisave (Hise) Depot (Quantity = 12510 Cum) In Connection With The Work Of Chikka Banavara Sec : Through Ballast Recoupment For A Length Of 7.881 Km In Looplines Of B G Nagar (Bgnr), Hirisave (Hise), Shravanabelagola (Sbga), Channarayapatna (Cnpa) And Samudravalli (Dsvs) Yards
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74372989 |
|
Reference Number |
07SBC24of03-04-24Item-06 |
| Tender Fee | 0 |
| EMD | 2.25 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74372989/viewNitPdf_4523219.pdf |
| Start Date | April 03, 2024 21:05 |
| End Date |
Expired
29/04/2024
Expired 852 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sw i : chikka banavara - hassan section : through ballast recoupment for a length of 7.881 km in looplines of b g nagar (bgnr), hirisave (hise), shravanabelagola (sbga), channarayapatna (cnpa) and samudravalli (dsvs) yards. sw ii : bengaluru - salem section : through ballast recoupment of points and crossing at dharmapuri (dpj), rayakottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards - total 11 nos in aden/dharmapuri section. sw iii : bengaluru - salem sec
For complete deion and other details, please refer to tender
Read moreManufacturing, supply and stacking of machine crushed track ballast at hirisave (hise) depot (quantity - 1,43,000 cum) including loading in connection with the work of chickbanawar - hassan : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). (2 packet tender)
For complete deion and other details, please refer to tender
Read moreChikkabanavara - hassan section : sw i : slope stabilization by widening of slopes of cuttings from km 145/100-146/300 between d-samudravalli (dsvs) - shantigrama (siga) stations in sse/pway/cnpa section. sw ii : slope stabilization by widening of slopes of cuttings from km 130/800-132/200, 136/200-900 and 143/600-144/600 between shravanabelagola (sbga) - shantigrama (siga) stations in sse/pway/cnpa section. (two-packet tender)
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed extension of ballast depot (210m x 18m) and approach road (400m x 4.5m) at hirisave (hise) in aden/kigl sec, under den/south/sbc jurisdiction. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSw i : chikkabanavara - hassan section : pro. extension of hl platform for nelamangala (nmga) station pf-1 by 140 mtr, kunigal (kigl) station pf - 1, 2 and 3 by 20mtr, yediyuru (yy) station pf - 1, 2 and 3 by 40 mtr in aden/kunigal subdivision. sw ii : chikkabanavara - hassan section : pro. extension of platform for b g nagar (bgnr) station pf-1 and 2 by 16 mtr, hirisave (hise) pf-1, 2 and 3 by 20 mtr, sharavanabelagola (sbga) station pf-1, 2 and 3 by 138m each, channarayapatna (cnpa) pf-1,
For complete deion and other details, please refer to tender
Read more[i]ohe modification required for construction of track machine siding at baw, yy, sbga and nmga station length of 420m [ii]ohe modification in connection with the proposed extension of platform bgnr pf-1&2 by mtr, hise pf-1, 2&3 by 20 mtr, sbga pf-1, pf-2&3 by 138m each, cnpa pf-1, 2&3 by 140 mtr and compound wall at cnpa station in aden/kigl subdivision. [iii]pending works after electrification of baw-has(gr296) sections of sbc division. [iv]trd works in connection with engine
For complete deion and other details, please refer to tender
Read more[i]ohe modification required for construction of track machine siding at baw, yy, sbga and nmga station length of 420m [ii]ohe modification in connection with the proposed extension of platform bgnr pf-1&2 by 16 mtr, hise pf-1, 2&3 by 20 mtr, sbga pf-1, pf-2&3 by 138m each, cnpa pf-1, 2&3 by 140 mtr and compound wall at cnpa station in aden/kigl subdivision. [iii]pending works after electrification of baw-has(gr296) sections of sbc division. [iv]trd works in connection with eng
For complete deion and other details, please refer to tender
Read moreof your Industry type