Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Chikka Banavara Hassan Section : Strengthening Of Bank By Providing Standard Width And Improving Drainage At Isolated Locations From 3/870 To 79/530 (Sl) For A Length Of 16.65 Km. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 83922690 |
|
Reference Number |
20SBC25OF03-09-25ITEM-01 |
| Tender Fee | 0 |
| EMD | 2.3 Lakh |
| Tender Value | |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102025/83922690/viewNitPdf_5090368.pdf |
| Start Date | September 03, 2025 19:10 |
| End Date |
Expired
06/10/2025
Expired 271 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sw i : bengaluru - salem section : proposed extension road surface at lc 143 in aden/dpj section. sw ii : chikka banavara - hassan section : construction of rcc side drain for a length of 750m in connection with the work of strengthening of bank by providing standard width and improving drainage at isolated locations from km 3/870 to 79/530 (sl) for a length of 16.65 km. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : re-profiling and protection of slope by providing turfing at km 39/100-41/400. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : construction of rub (rcc box size : 1 x 7.50 x 4.50m) at km 14/300-400 at nelamangala (nmga station) by rolling in / launching method. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed extension of ballast depot (210m x 18m) and approach road (400m x 4.5m) at hirisave (hise) in aden/kigl sec, under den/south/sbc jurisdiction. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : through rail renewal (primary) 0.95km length from 13/055-14/005 (sl) and through turnout renewal of point no. 51b (cscmsc) at nelamangala (nmga) yard
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at railway km 20/750 near nelamangala station - rcc box size 1 x 5.0m x 4.25m by box pushing method - deposit work for yettinahole project division no. 4. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at rly km 20/750 near nelamangala station - rcc box size 1m x 5.0m x 4.25m by box pushing method (deposit work for yettinahole project division no. 4). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreYelahanka - chintamani section: cess repair and widening of formation of isolated locations for a length of 13.55 km from 1/600 to 75/200 (sl) in sse/pway/ynk section. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section: earhwork in connection with the work of ctr(p) for a length of 16km from 11/900-23/0 and 72/100-77/0 sl to replace d mark rails . sw ii : cess work in connection with the work of chikka banavara - hassan sec : through ballast recoupment of points and crossings at nelamangala yard - 08 numbers . maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: strengthening of bank by providing standard width and improving drainage at isolated locationsfrom km 216/000-238a/000 up and down line for 8.66kms and 289/100-302/600 up and down for 5.653kms (total length - 14.313kms). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type