Tender Details
Particulars | Details |
---|---|
Title |
Sw I : Bengaluru Salem Section: Earhwork In Connection With The Work Of Ctr(p) For A Length Of 16km From 11/900 23/0 And 72/100 77/0 Sl To Replace D Mark Rails .
Sw Ii : Cess Work In Connection With The Work Of Chikka Banavara Hassan Sec : Through Ballast Recoupment Of Points And Crossings At Nelamangala Yard 08 Numbers . Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 72545611 |
Reference Number |
18SBC23OF13-12-2023Item-1 |
Tender Fee | 0 |
EMD | 2.03 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72545611/viewNitPdf_4424014.pdf |
Start Date | December 13, 2023 17:41 |
End Date |
08/01/2024 ( Expired 493 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sw i : bengaluru - salem section : deepscreening work of 14.65 km length at km 205/350-220/000 sl, in connection with the work of sbc-sa section : ctr(p) of exg. 52kg/90 uts rails on 52kg psc sleepers of 1540 nos/km with 60kgs/90 uts rails on 60kg psc sleepers of 1660 nos/km for a length of 14.65 km from km 205/350-220/000 sl in den/south/sbc section sw ii : bengaluru - salem section : through sleeper renewal for a length of 1 km from 110/500-118/000 (scattered locations) in aden/dharmapuri se
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - salem section : proposed extension road surface at lc 143 in aden/dpj section. sw ii : chikka banavara - hassan section : construction of rcc side drain for a length of 750m in connection with the work of strengthening of bank by providing standard width and improving drainage at isolated locations from km 3/870 to 79/530 (sl) for a length of 16.65 km. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at railway km 20/750 near nelamangala station - rcc box size 1 x 5.0m x 4.25m by box pushing method - deposit work for yettinahole project division no. 4. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreSw i : yelahanka - rajanakunte : pro. construction of goomties at lc 20 between km 23/000-100. sw ii : construction of rcc drain for a length of 2160m in connection with the work of bengaluru -sampige road and bangalore - dharmavaram sec: through turnout renewal (ttr) of existing curved switch and cms crossing with 60 kg tws and 60 kg weldable crossing - 1in12 - total : 48 nos in sbc-spgr section in aden/yeswanthpur section and through ballast recoupment (tbr) of points and crossings - 13 nos
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru-salem section : construction of rcc drain 600m in connection with the work of sbc-sa sec : strengthening of bank by providing standard width and improving drainage at isolated locations from km 68/100 to 143/400 sl for a length of 17.26 km. sw ii : bengaluru - salem section : construction of rcc drain 3000m and ballast retaning wall 1900m in connection with the work of sbc-sa sec: complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60kg/90 uts ra
For complete deion and other details, please refer to tender
Read moreDen/south/sbc sec : cess repair/widening work in connection with the work of (a) sbc-sa sec : complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60 kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dpj section. (b) baw-has : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBangalore - mysore section: construction of rrm drain and ballast retaining wall 1000m in connection with the work of complete track renewal (ctr(p)) of existing 52kg rails with 60kg for a length of 28.30kms from 13/500-30/000 and 31/800 - 43/600 up line in sse/p.way/kgi section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreSr. den/south/sbc section : manufacturing, supply and stacking of machine crushed track ballast including leading and loading at periya naga thunnai (prnt) depot and karuvalli (kvlr) cess in connection with the work of bangalore-salem section : ctr(p) for a length of 16km from 11/900-23/0 and 72/100-77/0 sl to replace d mark rails.
For complete deion and other details, please refer to tender
Read moreSw-i: bengaluru - salem sec: strengthening of bank by providing standard width in isolated locations for a length of 18.85km from km 145/650-165/600 sl in aden/dharmapuri section. sw-ii: bengaluru - salem sec: cess work in connection with the work of through ballast recoupment of points and crossings at dharmapuri (dpj), rayakkottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards-total 11 nos in aden/dharmapuri section. maintenance period is 6 months or one mo
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road section : proposed construction of rcc drain in connection with the work of through ballast recoupment of points and crossings - 6 points in dodbele (dbl) yard and 4 points in hirehalli (hhl) yard (total 10 nos.,) . sw ii : bengaluru - sampige road sec : construction of balance retaining wall, approach road etc., of rub in lieu of lc-37 at km 64/200-300 in kyatsandra (kiat) station yard. sw iii : yelahanka - chintamani section : proposed improvement
For complete deion and other details, please refer to tender
Read moreof your Industry type