Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sw I : Bengaluru Salem Section: Earhwork In Connection With The Work Of Ctr(p) For A Length Of 16km From 11/900 23/0 And 72/100 77/0 Sl To Replace D Mark Rails .
Sw Ii : Cess Work In Connection With The Work Of Chikka Banavara Hassan Sec : Through Ballast Recoupment Of Points And Crossings At Nelamangala Yard 08 Numbers . Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72545611 |
|
Reference Number |
18SBC23OF13-12-2023Item-1 |
| Tender Fee | 0 |
| EMD | 2.03 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72545611/viewNitPdf_4424014.pdf |
| Start Date | December 13, 2023 17:41 |
| End Date |
Expired
08/01/2024
Expired 1012 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Chikka banavara - hassan section : construction of rub (rcc box size : 1 x 7.50 x 4.50m) at km 14/300-400 at nelamangala (nmga station) by rolling in / launching method. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : re-profiling and protection of slope by providing turfing at km 39/100-41/400. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at railway km 20/750 near nelamangala station - rcc box size 1 x 5.0m x 4.25m by box pushing method - deposit work for yettinahole project division no. 4. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at rly km 20/750 near nelamangala station - rcc box size 1m x 5.0m x 4.25m by box pushing method (deposit work for yettinahole project division no. 4). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : through rail renewal (primary) 0.95km length from 13/055-14/005 (sl) and through turnout renewal of point no. 51b (cscmsc) at nelamangala (nmga) yard
For complete deion and other details, please refer to tender
Read moreSw i : chikka banavara - hassan section : renewal of existing 52/60kg conventional sej to thick web sej - 40 numbers. sw ii : chikka banavara - hassan section : ttr (tws wcms) of existing 6 numbers of 1 in 12 and 1 number of 1 in 16 points with tws and wcms, total 7 sets at hirisave (hise) and channarayapatna (cnpa) yards in sse/pway/cnpa section. sw iii : chikka banavara - hassan section : ttr of existing 1 in 12 curved switch (5 numbers) and 1 in 16 curved switch (2 numbers) with tws, we
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed extension of ballast depot (210m x 18m) and approach road (400m x 4.5m) at hirisave (hise) in aden/kigl sec, under den/south/sbc jurisdiction. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : strengthening of bank by providing standard width and improving drainage at isolated locations from 3/870 to 79/530 (sl) for a length of 16.65 km. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSw i : chikka banavara - hassan section : through ballast recoupment for a length of 7.881 km in looplines of b g nagar (bgnr), hirisave (hise), shravanabelagola (sbga), channarayapatna (cnpa) and samudravalli (dsvs) yards. sw ii : bengaluru - salem section : through ballast recoupment of points and crossing at dharmapuri (dpj), rayakottai (ryc), periya naga thunai (prnt), kelamangalam (kmlm) and banaswadi (band) yards - total 11 nos in aden/dharmapuri section. sw iii : bengaluru - salem sec
For complete deion and other details, please refer to tender
Read moreSw i : manufacturing, supply and stacking of machine crushed track ballast including leading and loading at periya naga thunai (prnt) depot (quantity = 21,150 cum) in connection with the work of (a) bengaluru-salem section : increasing sleeper density of existing 52kg psc sleepers of 1310/km to 1540/km for a length of 9.565km in loop lines of aden/dharmapuri, (b) chikka banavara - hassan section : through ballast recoupment of points and crossings at nelamangala (nmga) yard - 08 nos., (c) thro
For complete deion and other details, please refer to tender
Read moreof your Industry type