Tender Details
Particulars | Details |
---|---|
Title |
Ksr Bengaluru: Provision Of Covered Shelter And Granite Flooring At Open Area Between Platform 7 And &Amp At Ksr Bengaluru Station. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79564935 |
Reference Number |
02SBC25OF16-01-25Item-06 |
Tender Fee | 0 |
EMD | 2.53 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79564935/viewNitPdf_4834707.pdf |
Start Date | January 17, 2025 00:07 |
End Date |
10/02/2025 ( Expired 70 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provn of all weather covered trg area with 2 fit raised platform and kota stone flooring at dtf of rvc centre and college and provn of internal and external electrification of station auditorium at babugarh under age b/r-ii and age e/m-i of ge (north
Provn of all weather covered trg area with 2 fit raised platform and kota stone flooring at dtf of rvc centre and college and provn of internal and external electrification of station auditorium at babugarh under age b/r-ii and age e/m-i of ge (north
Read moreHiring of skid steer loader machines for collection of refuse at open dumps and gvps in l ward of eastern suburb for the period of 6 months
Hiring of skid steer loader machines for collection of refuse at open dumps and gvps in l ward of eastern suburb for the period of 6 months &#x0d
Read moreOperation and maintenance of sewage treatment plant 7 mld capacity on sbr technology and main pumping station 40 mld disposal works at sahnewal town for the 3 year 2025to2028 period 01.04.2025 to 31.03.2028 for 36 months app cost lumpsum basis
Operation and maintenance of sewage treatment plant 7 mld capacity on sbr technology and main pumping station 40 mld disposal works at sahnewal town for the 3 year 2025to2028 period 01.04.2025 to 31.03.2028 for 36 months app cost lumpsum basis&#x0d
Read moreMalda division, eastern railway, invites e-tender, competitive, single stage, two packet system, from food and catering services providers for provision of catering services through modular catering stall at malda railway station (category-a) on pf no. 6/7, in between col. 15 & fob njp end for a period of 05(five) years under general minor unit/women
For complete deion and other details, please refer to tender
Read moreProvision of milk bar at dindigul pf 2 railway station for a period of five years. location: pf 2 between platform shelter post 7/2 & 8/2.sketch enclosed.catg of station: a.size of the unit-60 sqft
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: replacement of steel girders with psc slabs (1x11.52m) for bridge no. 838/b up and down line at km. 347/500-600 between bengaluru east (bnce) - byappanahalli (bypl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreKsr bengaluru: provision of covered shelter and granite flooring at open area between platform - 7 and & at ksr bengaluru station. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : slope stabilization by widening of slopes of cuttings from km 50/000-100, 50/800-51/050, 51/300-500, 51/760-880 in sse/pway/tpp between muttampatti (mpc) and sivadi (szv) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed extension of ballast depot (210m x 18m) and approach road (400m x 4.5m) at hirisave (hise) in aden/kigl sec, under den/south/sbc jurisdiction. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed new bridge no. 39-a at railway km 20/750 near nelamangala station - rcc box size 1 x 5.0m x 4.25m by box pushing method - deposit work for yettinahole project division no. 4. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreof your Industry type