Tender Details
Particulars | Details |
---|---|
Title |
Bangalore Jolarpettai Section: Replacement Of Steel Girders With Psc Slabs (1x11.52m) For Bridge No. 838/B Up And Down Line At Km. 347/500 600 Between Bengaluru East (Bnce) Byappanahalli (Bypl) Stations. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79501168 |
Reference Number |
02SBC25OF16-01-25Item-03 |
Tender Fee | 0 |
EMD | 2.06 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79501168/viewNitPdf_4831772.pdf |
Start Date | January 16, 2025 23:51 |
End Date |
10/02/2025 ( Expired 70 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bangalore -jolarpettai section: replacement of steel girders with psc slabs (1x11.52m) for bridge no. 838/b up and down line at km. 347/500-600 between bengaluru east (bnce) - byappanahalli (bypl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : slope stabilization by widening of slopes of cuttings from km 50/000-100, 50/800-51/050, 51/300-500, 51/760-880 in sse/pway/tpp between muttampatti (mpc) and sivadi (szv) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru division: balance work of replacement of steel girder with psc slab for bridge no. 550 at km 45/400-500 between ramanagaram (rmgm) -channapatna (cpt) stations in sbc - mys section. maintenance period is 3 months.
For complete deion and other details, please refer to tender
Read moreBengaluru-dharmavaram section: construction of rcc side drain for a length of 1200m in connection with the work of complete track renewal(p) of existing 60kg rails on 60kg psc with 60kg 90uts rails on 60kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn & 56/134-58/100 up between oddarahalli - thondebhavi station in sse/pway/hup section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreBangalore - mysore section: construction of rrm drain and ballast retaining wall 1000m in connection with the work of complete track renewal (ctr(p)) of existing 52kg rails with 60kg for a length of 28.30kms from 13/500-30/000 and 31/800 - 43/600 up line in sse/p.way/kgi section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreBaiyyappanahalli-dharmavaram section: proposed for extra approach road provision at rub/br no. pd-66a at km.22/600-700 between sri sathya sai prashanthi nilayam (sspn) - kotha cheruvu (ktcr) stations and completion of pending rcc pipe drain work at water logging rub no.pd-66 at km.22/600-700 between sri sathya sai prashanthi nilayam (sspn) - basampalle (bspl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : bengaluru-sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 60 at km 98/600-700 between nittur (ntr) and sampige road (spgr) stations for double track along with u-type rcc retaining wall and bt road connecting lc no. 60 and lc no. 59. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: strengthening of bank by providing standard width and improving drainage at isolated locationsfrom km 216/000-238a/000 up and down line for 8.66kms and 289/100-302/600 up and down for 5.653kms (total length - 14.313kms). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSecunderabad division - gsu - kazipet - balharshah section - proposed construction of two lane road over bridge in lieu of lc nos 9,11,15,16 & 17 with bow string steel girder on railway span with rcc deck slab and approaches with precast psc girders/slabs/re wall with precast pier caps over cast-in-situ piers/abutments along with lhs between hasanparti road - uppal - jammikunta stations.
For complete deion and other details, please refer to tender
Read moreof your Industry type