Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bengaluru Division : Replacement Of Steel Girder For Bridge No. 422 At Km 0/800 900 (B Line And Shunting Neck) Between Bengaluru (Sbc) Yesvanthpur (Ypr) Section. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73265304 |
|
Reference Number |
02SBC24of25-01-24Item05 |
| Tender Fee | 0 |
| EMD | 2.81 Lakh |
| Tender Value | |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022024/73265304/viewNitPdf_4463224.pdf |
| Start Date | January 25, 2024 16:58 |
| End Date |
Expired
19/02/2024
Expired 861 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bengaluru division : replacement of steel girder for bridge no. 422 at km 0/800-900 (b-line and shunting neck) between bengaluru (sbc) - yesvanthpur (ypr) section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreBengaluru division : replacement of steel girder for bridge no. 422 at km 0/800-900 (b-line and shunting neck) between bengaluru (sbc) - yesvanthpur (ypr) section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreSw i: replacement of steel girder with psc slab for bridge no. 490 (1x12.20m) at km 29/800-900 between rajanukunte and dodballapur stations of baiyappanahalli - dharmavaram section. sw-ii: replacement of steel girder with psc slabs of size above 9.15m and up to 12.20m span bridges for bridge no. 448 at km 8/398 between nayandahalli (nyh) - jnana bharati halt (gnb) stations of bengaluru - mysuru section. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 50 at km 85/800-900 between mallasandra (mlsa) - gubbi (gbb) station for double track. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: replacement of steel girders with psc slabs (1x11.52m) for bridge no. 838/b up and down line at km. 347/500-600 between bengaluru east (bnce) - byappanahalli (bypl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: sw-i: replacement of steel girder with psc slab of bridge no. 683 at km 246/100-200 (exg. span 2x12.20 up and down) in aden/bangarpet subdivision. sw-ii: replacement of steel girders with psc slabs (1x11.52m) for bridge no. 838/b up and down line at km. 347/500-600 between bengaluru east (bnce) - byappanahalli (bypl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru division: balance work of replacement of steel girder with psc slab for bridge no. 550 at km 45/400-500 between ramanagaram (rmgm) -channapatna (cpt) stations in sbc - mys section. maintenance period is 3 months.
For complete deion and other details, please refer to tender
Read moreSw i : aden/yesvanthpur sub-division : provision of rdso type height gauges for (bridge no) rubs no. 540-a, 516-b in yelahanka - dharmavaram section & 169-a, 154-c, 134-a and 149-b in yelahanka - bangarpet section under aden/ypr subdivision. sw ii : aden/ypr sec : provision of rdso type height gauges for rubs no. 308-c, 420-a, 390 in bengaluru - sampige road section and 589-a, 529-dn and 524-b in yesvanthpur - yelahanka section under aden/ypr subdivision. sw iii : aden/hindupur sub-div
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : slope stabilization by widening of slopes of cuttings from km 50/000-100, 50/800-51/050, 51/300-500, 51/760-880 in sse/pway/tpp between muttampatti (mpc) and sivadi (szv) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru salem section : sw i : slope stabilization by widening of slopes of cuttings from km 51/940-52/100, 52/550-800, 52/900-53/040 in sse/pway/dharmapuri (south) section. sw ii : slope stabilization by widening of slopes in cuttings from km 111/000-112/400, 127/630-800, 129/400-130/000 and 137/100-200 in aden/dharmapuri section. maintenance period is 6 months or one monsoon period whichever is later. (two packet system)
For complete deion and other details, please refer to tender
Read moreof your Industry type