Tender Details
Particulars | Details |
---|---|
Title |
Bengaluru Sampige Road Section : Proposed Construction Of Rub Of Size 1x6x3m In Lieu Of Lc No. 50 At Km 85/800 900 Between Mallasandra (Mlsa) Gubbi (Gbb) Station For Double Track. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78824913 |
Reference Number |
30SBC24OF09-12-24Item-6 |
Tender Fee | 0 |
EMD | 4.46 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78824913/viewNitPdf_4795384.pdf |
Start Date | December 09, 2024 21:51 |
End Date |
01/01/2025 ( Expired 132 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works, in connection with following works : (1) subway (lhs) at rly kms 415/10-12 (girna pumping road) between jalgaon-shirsoli station. (2) rub in lieu of lc 19 at km 376.625 between csn-dhi section.
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: replacement of steel girders with psc slabs (1x11.52m) for bridge no. 838/b up and down line at km. 347/500-600 between bengaluru east (bnce) - byappanahalli (bypl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreKsr bengaluru: provision of covered shelter and granite flooring at open area between platform - 7 and & at ksr bengaluru station. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : slope stabilization by widening of slopes of cuttings from km 50/000-100, 50/800-51/050, 51/300-500, 51/760-880 in sse/pway/tpp between muttampatti (mpc) and sivadi (szv) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 50 at km 85/800-900 between mallasandra (mlsa) - gubbi (gbb) station for double track. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreLonda-miraj section-construction of rob at km.613/800-900 in lieu of lc no 392 between belagavi-sambre station as 1x36m composite girder clear span ( railway portion) with 5x18.71m psc girder (nh end) and 6x18.71 m psc girder (mutaga end) and cc block in approaches between belagavi and sambre stations.(composite work)
For complete deion and other details, please refer to tender
Read moreBengaluru salem section : sw i : slope stabilization by widening of slopes of cuttings from km 51/940-52/100, 52/550-800, 52/900-53/040 in sse/pway/dharmapuri (south) section. sw ii : slope stabilization by widening of slopes in cuttings from km 111/000-112/400, 127/630-800, 129/400-130/000 and 137/100-200 in aden/dharmapuri section. maintenance period is 6 months or one monsoon period whichever is later. (two packet system)
For complete deion and other details, please refer to tender
Read moreBangalore - mysore section: construction of rrm drain and ballast retaining wall 1000m in connection with the work of complete track renewal (ctr(p)) of existing 52kg rails with 60kg for a length of 28.30kms from 13/500-30/000 and 31/800 - 43/600 up line in sse/p.way/kgi section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreLonda-miraj section construction of rub of size 1x5.5x5.5m segmental rcc twin boxes in lieu of lc no.380 at km.606/800-607/000 between desur & belgavi stations by box pushing method. (composite work)
For complete deion and other details, please refer to tender
Read moreBaiyyappanahalli-dharmavaram section: proposed for extra approach road provision at rub/br no. pd-66a at km.22/600-700 between sri sathya sai prashanthi nilayam (sspn) - kotha cheruvu (ktcr) stations and completion of pending rcc pipe drain work at water logging rub no.pd-66 at km.22/600-700 between sri sathya sai prashanthi nilayam (sspn) - basampalle (bspl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type