Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bengaluru Sampige Road Section : Proposed Construction Of Rub Of Size 1x6x3m In Lieu Of Lc No. 50 At Km 85/800 900 Between Mallasandra (Mlsa) Gubbi (Gbb) Station For Double Track. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78824913 |
|
Reference Number |
30SBC24OF09-12-24Item-6 |
| Tender Fee | 0 |
| EMD | 4.46 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78824913/viewNitPdf_4795384.pdf |
| Start Date | December 09, 2024 21:51 |
| End Date |
Expired
01/01/2025
Expired 651 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sr. den/north/sbc sec : bengaluru-sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 60 at km 98/600-700 between nittur (ntr) and sampige road (spgr) stations for double track along with u-type rcc retaining wall and bt road connecting lc no. 60 and lc no. 59. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreKsr bengaluru: provision of covered shelter and granite flooring at open area between platform - 7 and & at ksr bengaluru station. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru division : replacement of steel girder for bridge no. 422 at km 0/800-900 (b-line and shunting neck) between bengaluru (sbc) - yesvanthpur (ypr) section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreBengaluru division : replacement of steel girder for bridge no. 422 at km 0/800-900 (b-line and shunting neck) between bengaluru (sbc) - yesvanthpur (ypr) section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreBengaluru division : replacement of steel girder for bridge no. 422 at km 0/800-900 (b-line and shunting neck) between bengaluru (sbc) - yesvanthpur (ypr) section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc jurisdiction : sw i : aden/yesvanthpur sub-division : proposed construction of toilets for divyang persons at heggere halt (hei), mallasandra (mlsa), gubbi (gbb), nittur (ntr), sampige road (spgr) and yelahanka (ynk) pf no. 4/5 stations. sw ii : aden/yesvanthpur sub-division : provision of divyangjan facilities like toilets, drinking water booths, railing, non-slippery walkways, ramps and trolley path at chikka banavara (baw), golhalli (ghl), dodbele (dbl), nidavanda (ndv), d
For complete deion and other details, please refer to tender
Read moreBangalore -jolarpettai section: replacement of steel girders with psc slabs (1x11.52m) for bridge no. 838/b up and down line at km. 347/500-600 between bengaluru east (bnce) - byappanahalli (bypl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: rub in lieu of lc no. 16 at km 17/500-600 rcc box of size 2 x 5.00m x 5.00m by rolling/launching method in aden/mandya sub division. maintenance period is 6months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type