Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bengaluru Mysuru Section: Rub In Lieu Of Lc No. 16 At Km 17/500 600 Rcc Box Of Size 2 X 5.00m X 5.00m By Rolling/Launching Method In Aden/Mandya Sub Division. Maintenance Period Is 6months Or One Monsoon Period Whichever Is Later.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73592893 |
|
Reference Number |
04SBC24OF16-02-24Item-4 |
| Tender Fee | 0 |
| EMD | 5.44 Lakh |
| Tender Value | |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73592893/viewNitPdf_4481041.pdf |
| Start Date | February 16, 2024 18:20 |
| End Date |
Expired
11/03/2024
Expired 837 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sr.den/s section- provision of rub/lhs size 4.50x4.50 in lieu of lc 235 in jp-fl section under aden-line jp and rub/lhs of size 5.00m x 2.50m in lieu of lc no.1 in fl-ju section under aden-fl
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : construction of rub (rcc box size : 1 x 7.50 x 4.50m) at km 14/300-400 at nelamangala (nmga station) by rolling in / launching method. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: improvements to minor bridges (26nos) in sse/p.way/mandya section in aden/mandya subdivision. (bridge no. 553, 555,558, 559, 562, 564, 576, 577, 579, 590, 591, 592, 606, 607, 612, 615, 616, 618, 633, 634, 646, 655, 657, 659, 665, 674). sw-ii: bengaluru - mysuru section: providing drainage arrangements at waterlogging rub no. 611a in lieu of lc no. 54 at km 65/900-66/000 in aden/mandya sub division (composite work). maintenance period is 6 months or one monso
For complete deion and other details, please refer to tender
Read moreBengaluru - sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 50 at km 85/800-900 between mallasandra (mlsa) - gubbi (gbb) station for double track. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : bengaluru-sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 60 at km 98/600-700 between nittur (ntr) and sampige road (spgr) stations for double track along with u-type rcc retaining wall and bt road connecting lc no. 60 and lc no. 59. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreRatlam division : construction of subway (rub) in lieu of lc no. 227 (km: 457/09-10), lc no. 230 (km: 464/16-17), lc no. 234 (km: 472/14-15), lc no. 237 (km: 477/05-06) in ratlam-khandwa section and lc no. 01 (km: 2/9-3/0) & 02 (km: 05/07-08) in rau-dhd section by ing relieving girder and laying the box(es) by pushing the box below the relieving girder.
For complete deion and other details, please refer to tender
Read moreof your Industry type