Tender Details
Particulars | Details |
---|---|
Title |
Sr. Den/North/Sbc Sec : Bengaluru Sampige Road Section : Proposed Construction Of Rub Of Size 1x6x3m In Lieu Of Lc No. 60 At Km 98/600 700 Between Nittur (Ntr) And Sampige Road (Spgr) Stations For Double Track Along With U Type Rcc Retaining Wall And Bt Road Connecting Lc No. 60 And Lc No. 59. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77939605 |
Reference Number |
25SBC24OF17-10-24Item-01 |
Tender Fee | 0 |
EMD | 5.96 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77939605/viewNitPdf_4741856.pdf |
Start Date | October 17, 2024 22:30 |
End Date |
11/11/2024 ( Expired 161 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bengaluru - sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 50 at km 85/800-900 between mallasandra (mlsa) - gubbi (gbb) station for double track. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSw i : yelahanka - rajanakunte : pro. construction of goomties at lc 20 between km 23/000-100. sw ii : construction of rcc drain for a length of 2160m in connection with the work of bengaluru -sampige road and bangalore - dharmavaram sec: through turnout renewal (ttr) of existing curved switch and cms crossing with 60 kg tws and 60 kg weldable crossing - 1in12 - total : 48 nos in sbc-spgr section in aden/yeswanthpur section and through ballast recoupment (tbr) of points and crossings - 13 nos
For complete deion and other details, please refer to tender
Read moreDen/south/sbc sec : cess repair/widening work in connection with the work of (a) sbc-sa sec : complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60 kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dpj section. (b) baw-has : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBaiyyappanahalli-dharmavaram section: proposed for extra approach road provision at rub/br no. pd-66a at km.22/600-700 between sri sathya sai prashanthi nilayam (sspn) - kotha cheruvu (ktcr) stations and completion of pending rcc pipe drain work at water logging rub no.pd-66 at km.22/600-700 between sri sathya sai prashanthi nilayam (sspn) - basampalle (bspl) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : bengaluru-sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 60 at km 98/600-700 between nittur (ntr) and sampige road (spgr) stations for double track along with u-type rcc retaining wall and bt road connecting lc no. 60 and lc no. 59. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : sw i : yesvantpur - sampige road section : proposed limited height subway at old lc 43 (lhs no. 297/b) km 73/000-100 at bheemasandra - rcc box of size 1x5x2.25 by rolling/launching method in aden/yesvantpur sub-division. sw ii : yesvantpur - sampige road section : proposed pedestrian subway at old shettyhalli gate km 67/700-800 near shettyhalli - rcc box of size 1x4x2.25 by rolling/launching method in aden/yesvantpur sub-division. maintenance period is 6 months or one
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc jurisdiction : sw i : aden/yesvanthpur sub-division : proposed construction of toilets for divyang persons at heggere halt (hei), mallasandra (mlsa), gubbi (gbb), nittur (ntr), sampige road (spgr) and yelahanka (ynk) pf no. 4/5 stations. sw ii : aden/yesvanthpur sub-division : provision of divyangjan facilities like toilets, drinking water booths, railing, non-slippery walkways, ramps and trolley path at chikka banavara (baw), golhalli (ghl), dodbele (dbl), nidavanda (ndv), d
For complete deion and other details, please refer to tender
Read moreBengaluru division : replacement of steel girder for bridge no. 422 at km 0/800-900 (b-line and shunting neck) between bengaluru (sbc) - yesvanthpur (ypr) section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: rub in lieu of lc no. 16 at km 17/500-600 rcc box of size 2 x 5.00m x 5.00m by rolling/launching method in aden/mandya sub division. maintenance period is 6months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type