Tender Details

Particulars Details
Title
Widening And Strengthening Of Nh 27 To Akodhi Nera Kripalpur Ramau Rajpur Road (Odr) In Km. 1 To 3 In District Kanpur Dehat In Financial Year 2024 25 (Including 05 Years Maintenance Cost.) (Total Length 3.000 Km.)
Description
Widening And Strengthening Of Nh 27 To Akodhi Nera Kripalpur Ramau Rajpur Road (Odr) In Km. 1 To 3 In District Kanpur Dehat In Financial Year 2024 25 (Including 05 Years Maintenance Cost.) (Total Length 3.000 Km.)
Organisation Cheif Engineer Kanpur Zone PWD Kanpur | State Govt. and UT
Tender Id 2025_CEKNP_1009451_1
Reference
Number
475C/131C-KV/2025 Dt. 23.01.2025
Tender Fee 7714
EMD 11 Lakh
Tender Value
Place Kanpur Dehat
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1810087
Start Date February 22, 2025 00:25
End Date

07/03/2025 ( Expired 120 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Short term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma

Short term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Read more
Strengthening of mubarakpur to bhankharpur road rd 0.34 km to 1.60 km (odr-05) in distt. sas nagar with 5 year maintenance (1st year defect liability period under 5054 rb-10 roads)

Strengthening of mubarakpur to bhankharpur road rd 0.34 km to 1.60 km (odr-05) in distt. sas nagar with 5 year maintenance (1st year defect liability period under 5054 rb-10 roads)

Read more
Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road odr, length 6.63 km under 5054 rb-10 roads fy 2025-26 in district rupnagar including 5 years maintenace 1 year dlp 4 years

Strengthening of chamkar sahib neelon doraha road to morinda chamkaur sahib road via village kandhola road odr, length 6.63 km under 5054 rb 10 roads fy 2025 26 in district rupnagar including 5 years maintenace (1 year defect liability plus 4 years

Read more
Short term maintenance to nh-627, (hakram to kheroni chariali road) from ch-62.900 to 90.000, (total length 27.10 km) of nh-627, under bakulia nh division diphu, in the state of assam for the year 2025-26

Short term maintenance to nh-627, (hakram to kheroni chariali road) from ch-62.900 to 90.000, (total length 27.10 km) of nh-627, under bakulia nh division diphu, in the state of assam for the year 2025-26

Read more
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Read more
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Read more
Post 5 years maintenance works through emarg from bagdihasole to bamunmari road within keshiary block in paschim medinipur district length 3.000 km nit04 of 2024-25 sl 17 (5th call) vide package no wb20mtn023

Post 5 years maintenance works through emarg from bagdihasole to bamunmari road within keshiary block in paschim medinipur district length 3.000 km nit04 of 2024-25 sl 17 (5th call) vide package no wb20mtn023

Read more
Widening and strengthening of the road from km 0/0 to 3/6 on madhira -tutikuntla road (madhira town limits) including drains and footpath in khammam district.(2nd call)

Widening and strengthening of the road from km 0/0 to 3/6 on madhira -tutikuntla road (madhira town limits) including drains and footpath in khammam district(2nd call)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise