Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement To Jategaon To Gadhepimpalgaon Road Vr 76 Km 2/00 To 4/00 Tq.Vaijapur
|
| Description |
Improvement To Jategaon To Gadhepimpalgaon Road Vr 76 Km 2/00 To 4/00 Tq.Vaijapur
|
| Organisation | Public Works Region | State Govt. and UT |
| Tender Id | 2024_PWR_1009696_1 |
|
Reference Number |
E TENDER NOTICE NO 51/28 FOR 2023-24 |
| Tender Fee | 1180 |
| EMD | 71000 |
| Tender Value | - |
| Place | VAIJAPUR |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1765646 |
| Start Date | February 17, 2024 22:15 |
| End Date |
Expired
24/02/2024
Expired 922 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Read moreAnnual maintenance of birur-sammasagi state highway (sh-76) from ch. 6.0 km to 30.40 km. in ajjampura taluk, chikmagalur district.
Annual maintenance of birur-sammasagi state highway (sh-76) from ch. 6.0 km to 30.40 km. in ajjampura taluk, chikmagalur district.
Read moreAnnual maintenance of road from nh-4 via urukere,tovinakere,dabbeghatta,rantavalalu joining a.p border from ch.21.64 to 21.75km, 23.45 to 23.60 km 28.00 to 29.00 km 30.00 to 39.60 and 40.65 to 42.00 km in madhugiri taluk for the year 2026-27
Annual maintenance of road from nh-4 via urukere,tovinakere,dabbeghatta,rantavalalu joining a.p border from ch.21.64 to 21.75km, 23.45 to 23.60 km 28.00 to 29.00 km 30.00 to 39.60 and 40.65 to 42.00 km in madhugiri taluk for the year 2026-27(total lenght 22.80km- 20.84 to 43.64km)
Read moreAnnual maintenance of road connecting from nh-4 to sh-94 road via bandepalya road ch 1.00 to 1.50 km in tumkur taluk (ch 0.00 to 1.50 km) for the year 2026-27
Annual maintenance of road connecting from nh-4 to sh-94 road via bandepalya road ch 1.00 to 1.50 km in tumkur taluk (ch 0.00 to 1.50 km) for the year 2026-27
Read moreAnuual maintenance of highway connecting birur sammasagi via ajjampura, sivani, channagiri, santhebennur, davangere, harihara, koda and thilavalli sh-76 from ch 82.92 to 103.53, 104.25 to 108.97 and 109.27 to 119.03 km in davanagere taluk for the year 2026-27.
Anuual maintenance of highway connecting birur sammasagi via ajjampura, sivani, channagiri, santhebennur, davangere, harihara, koda and thilavalli sh-76 from ch 82.92 to 103.53, 104.25 to 108.97 and 109.27 to 119.03 km in davanagere taluk for the year 2026-27.
Read moreAnnual maintenance to road from nh-4 to ginnappanahatti via bhuvanahalli, shagadadu from ch 0.00 to 10.00 km in sira taluk for the year 2026-27
Annual maintenance to road from nh-4 to ginnappanahatti via bhuvanahalli, shagadadu from ch 0.00 to 10.00 km in sira taluk for the year 2026-27
Read moreConstruction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreResurvey of yedamangala block bit i to iv proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 12.00 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of yedamangala block bit i to iv proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 12.00 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of yerehalli block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 9.00 km in tarikere range, bhadravathi division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Resurvey of yerehalli block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 9.00 km in tarikere range, bhadravathi division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Read moreResurvey of machina block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 19.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Resurvey of machina block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 19.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.
Read moreof your Industry type