Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Heavy Duty Energy Chain Of E4 Series Required Length– 35 Mtrs With Interlocking Design Of Materia
|
Description |
|
Organisation | Materials Management | Ministry of Coal |
Tender Id | GEM/2023/B/3787489 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://gem.gov.in/ |
Start Date | August 04, 2023 23:07 |
End Date |
25/08/2023 ( Expired 670 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | EMD Status | Status |
---|---|---|---|---|---|
1 | M/s. SABITA ENTERPRISES | Make : Igus India Pvt Ltd Model : E4.42.23.250.0 Title : E4.42. 23.250. 0 | 24-08-2023 12:07:40 | Offline upload | Qualified |
S.No. | Seller Name | Offered Item | Total Price | Rank |
---|---|---|---|---|
1 | M/s. SABITA ENTERPRISES | Item Categories : Heavy Duty Energy Chain of E4 Series required length– 35 Mtrs with interlocking design of materia | 2507320.00 | L1 |
Contract Details
- Contract Status:
- Order Completed
- Seller:
- M/s. SABITA ENTERPRISES
- Buyer Designation:
- SOMM KUSMUNDA AREA
- Buying Mode:
- Bid/RA
- Contract Date:
- 2023-09-27 22:36:00 +0530
- Contract Amount:
- 2507320
Product | Brand | Model | Ordered Quantity | Price |
---|---|---|---|---|
E4.42. 23.250. 0 | Igus India Pvt Ltd | E4.42.23.250.0 | 1 | ₹ 2507320.000 |
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreDevelopment of ujjain-jaora access controlled greenfield highway including ujjain spur connectivity as 4-lane with paved shoulder (design length - 98.73 km) in the state of madhya pradesh on hybrid annuity mode.
Development of ujjain-jaora access controlled greenfield highway including ujjain spur connectivity as 4-lane with paved shoulder (design length - 98.73 km) in the state of madhya pradesh on hybrid annuity mode.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreHeavy duty hydraulic open die forging press of capacity 3000 ton integrated with two rail bound manipulators
Heavy duty hydraulic open die forging press of capacity 3000 ton integrated with two rail bound manipulators
Read moreDesign, supply, construction, testing, trial and commissioning of 10 kld,15 kld,20 kld,25 kld and 35 kld fstps towards faecal sludge and septage management (fssm) with 10 years operation and maintenance.
Design, supply, construction, testing, trial and commissioning of 10 kld,15 kld,20 kld,25 kld and 35 kld fstps towards faecal sludge and septage management (fssm) with 10 years operation and maintenance.
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreConst. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreof your Industry type