Tender Details

Particulars Details
Title
Const. Of 2 N 4 Lane With Paved Shoulder From Design Km 114.000 Near Ashapur Vill To Design Km 149.000 Near Rudhy Vill Sec Of Nh347 B Of Betul Khandwa Pkg4 In Madhya Pradesh (Design Length 35.000 Km) On Ham Under Nh (O)
Description
Const. Of 2 N 4 Lane With Paved Shoulder From Design Km 114.000 Near Ashapur Vill To Design Km 149.000 Near Rudhy Vill Sec Of Nh347 B Of Betul Khandwa Pkg4 In Madhya Pradesh (Design Length 35.000 Km) On Ham Under Nh (O)
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 40000
EMD 3.05 Crore
Tender Value
Place NHAI HQ
Link

AAAAAAAAAA

Login to view
Start Date May 31, 2025 14:30
End Date

17/07/2025 ( 1 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Develop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham

Develop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham

Read more
Develop of 4lane ac sirhind sehna sec of nh205ag delhi amritsar highway nh44 near vill sirhind ch.27.370 to junc with dak expressway ne5 near malerkotla ch.79.200 total l51.83 km pkgi as a part of mohali barnala ic in punjab under nh o on ham

Develop of 4lane ac sirhind sehna sec of nh205ag delhi amritsar highway nh44 near vill sirhind ch.27.370 to junc with dak expressway ne5 near malerkotla ch.79.200 total l51.83 km pkgi as a part of mohali barnala ic in punjab under nh o on ham

Read more
Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.

Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.

Read more
Consultancy services of independent engineer for upgradation to four lane with paved shoulder of kalavad- jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat

Consultancy services of independent engineer for upgradation to four lane with paved shoulder of kalavad- jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat

Read more
Consultancy services for authority engineer for supervision of 2 lane paved shoulder / 4 laning of damoh jabalpur section of nh-34 in madhya pradesh from damoh (design ch.0.000km) to jabera (design ch.43.500) (pl 43.500 km) under nh(o) on epc mode

Consultancy services for authority engineer for supervision of 2 lane paved shoulder / 4 laning of damoh jabalpur section of nh-34 in madhya pradesh from damoh (design ch.0.000km) to jabera (design ch.43.500) (pl 43.500 km) under nh(o) on epc mode

Read more
Consultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti

Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise