Tender Details
Particulars | Details |
---|---|
Title |
Four Laning Of Badvel To Nellore Section Of Nh67 On Ham Pkg 3 Ing Near Yeturu Vill (Design Ch.705.048) And Ending Near Guruvindapudi Vill (Dc.739.094) With Design Length Of 34.046 Kms Under Nh(o) In The State Of Andhra Pradesh.
|
Description |
Four Laning Of Badvel To Nellore Section Of Nh67 On Ham Pkg 3 Ing Near Yeturu Vill (Design Ch.705.048) And Ending Near Guruvindapudi Vill (Dc.739.094) With Design Length Of 34.046 Kms Under Nh(o) In The State Of Andhra Pradesh.
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_201196_1 |
Reference Number |
NHAI/Tech/AP/NH67/ Bad Nel/PKG-III/2024/E-219083 |
Tender Fee | 90000 |
EMD | 8.73 Crore |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=220155 |
Start Date | July 12, 2024 17:00 |
End Date |
30/09/2024 ( Expired 232 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreDevelop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Develop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Read moreDevelop of 4lane ac sirhind sehna sec of nh205ag delhi amritsar highway nh44 near vill sirhind ch.27.370 to junc with dak expressway ne5 near malerkotla ch.79.200 total l51.83 km pkgi as a part of mohali barnala ic in punjab under nh o on ham
Develop of 4lane ac sirhind sehna sec of nh205ag delhi amritsar highway nh44 near vill sirhind ch.27.370 to junc with dak expressway ne5 near malerkotla ch.79.200 total l51.83 km pkgi as a part of mohali barnala ic in punjab under nh o on ham
Read moreOperation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Operation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Read moreDevelop. of 6lane gf pkg-iia s from ch.23.325 to design ch. 32.090 around kanpur city (length 8.765 kms) in the state of uttar pradesh on epc mode (2nd call)
Develop. of 6lane gf pkg-iia s from ch.23.325 to design ch. 32.090 around kanpur city (length 8.765 kms) in the state of uttar pradesh on epc mode (2nd call)
Read moreof your Industry type