Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Two Lane With Paved Shoulders Of Roshni To Ashapur (Betul To Khandwa Pkg Iii) From Design Km 89.900 To Design Km 114.000 Section In The State Of Madhya Pradesh On Epc Mode.
|
| Description |
Two Lane With Paved Shoulders Of Roshni To Ashapur (Betul To Khandwa Pkg Iii) From Design Km 89.900 To Design Km 114.000 Section In The State Of Madhya Pradesh On Epc Mode.
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2023_NHAI_179662_1 |
|
Reference Number |
- |
| Tender Fee | 40000 |
| EMD | 3.04 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=196681 |
| Start Date | December 29, 2023 14:30 |
| End Date |
Expired
02/03/2024
Expired 958 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreUpgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Upgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Read moreUpgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Read moreWidening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Read moreUpgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode
Upgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode
Read moreConsultancy services for authoritys engineer for upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode
Consultancy services for authoritys engineer for upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode
Read moreOne time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read more2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 in state of mp on epc mode
2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 in state of mp on epc mode
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreof your Industry type