Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Development Of Ujjain Jaora Access Controlled Greenfield Highway Including Ujjain Spur Connectivity As 4 Lane With Paved Shoulder (Design Length 98.73 Km) In The State Of Madhya Pradesh On Hybrid Annuity Mode.
|
| Description |
Development Of Ujjain Jaora Access Controlled Greenfield Highway Including Ujjain Spur Connectivity As 4 Lane With Paved Shoulder (Design Length 98.73 Km) In The State Of Madhya Pradesh On Hybrid Annuity Mode.
|
| Organisation | Madhya Pradesh Road Development Corporation Limited | State Govt. and UT |
| Tender Id | 2024_DLG_123574_10 |
|
Reference Number |
673 |
| Tender Fee | 51180 |
| EMD | 24.18 Crore |
| Tender Value | - |
| Place | Ujjain |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=509391 |
| Start Date | July 14, 2025 21:00 |
| End Date |
Expired
18/08/2025
Expired 423 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ie services for construction of 4 lane greenfield expressway spur from delhi-vadodara greenfield expressway near bandikui to jaipur in bharatmala pariyojana phase 1 in the state of rajasthan on hybrid annuity mode
Ie services for construction of 4 lane greenfield expressway spur from delhi-vadodara greenfield expressway near bandikui to jaipur in bharatmala pariyojana phase 1 in the state of rajasthan on hybrid annuity mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Read moreIndependent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Independent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Read moreConstruction of 6 lane access controlled amaravati outer ring road from nandigama to davuluru on hybrid annuity mode in the state of andhra pradesh. package 2 (from design km.27.000 to km.83.000).
Construction of 6 lane access controlled amaravati outer ring road from nandigama to davuluru on hybrid annuity mode in the state of andhra pradesh. package 2 (from design km.27.000 to km.83.000).
Read moreConsultancy services for preparation of detailed project report for development of bhopal-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-240 km approximately) (package-b)
Consultancy services for preparation of detailed project report for development of bhopal-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-240 km approximately) (package-b)
Read moreConsultancy services for preparation of detailed project report for development of bhopal-gwalior 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh. (project corridor length-320 km approximately) (package-a)
Consultancy services for preparation of detailed project report for development of bhopal-gwalior 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh. (project corridor length-320 km approximately) (package-a)
Read moreConsultancy services for preparation of detailed project report for development of katni-singrauli 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-235 km approximately) (package-c)
Consultancy services for preparation of detailed project report for development of katni-singrauli 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-235 km approximately) (package-c)
Read moreConsultancy services for preparation of detailed project report for development of sagar-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-135 km approximately) (package-d)
Consultancy services for preparation of detailed project report for development of sagar-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-135 km approximately) (package-d)
Read moreof your Industry type