Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Upgradation To Four Lane With Paved Shoulders Of Sadhuwali Banwala Section From Design Km. 00.000 To Km. 42.900 Of Nh 954 And Banwala Hanumangarh Section From Design Km 42.900 To Km 68.140 Of Nh 54 In The State Of Rajasthan On Hybrid Annuity Mode
|
| Description |
Upgradation To Four Lane With Paved Shoulders Of Sadhuwali Banwala Section From Design Km. 00.000 To Km. 42.900 Of Nh 954 And Banwala Hanumangarh Section From Design Km 42.900 To Km 68.140 Of Nh 54 In The State Of Rajasthan On Hybrid Annuity Mode
|
| Organisation | Ministry of Road Transport and Highways | Bharatmala Pariyojana and Special Projects (BPSP) Cell - MoRTH |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 90000 |
| EMD | 8.83 Crore |
| Tender Value | 882.52 Crore |
| Place | |
| Link | Login to view |
| Start Date | September 18, 2026 23:15 |
| End Date |
Open
05/11/2026
23 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Special repair work on banwala to kaluwala section on nh-954 from km 31.500 to 43.400 in the state of rajasthan
Special repair work on banwala to kaluwala section on nh-954 from km 31.500 to 43.400 in the state of rajasthan
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreWidening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreSix-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Read moreConsultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Read moreUpgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Read moreUpgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Upgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreof your Industry type