Tender Details

Particulars Details
Title
Consultancy Services For Independent Engineer For 4 Laning Of Muzaffarpur Sitamarhi Sonbarsa Section Of Nh 22 (Design Ch. Km. 0.000 To Design Ch. Km. 82.551 Total Length 82.551 Km) In The State Of Bihar On Hybrid Annuity Mode (Ham) (2nd Call)
Description
Consultancy Services For Independent Engineer For 4 Laning Of Muzaffarpur Sitamarhi Sonbarsa Section Of Nh 22 (Design Ch. Km. 0.000 To Design Ch. Km. 82.551 Total Length 82.551 Km) In The State Of Bihar On Hybrid Annuity Mode (Ham) (2nd Call)
Organisation National Highways Authority of India | Head Office - NHAI | Technical - NHAI
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 5000
EMD 10 Lakh
Tender Value -
Place
Link Login to view
Start Date July 02, 2026 14:30
End Date
Open 22/10/2026

7 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

Read more
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode

Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode

Read more
Independent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu

Independent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu

Read more
Independent engineer services during operation n maintenance period for 6 laning of kaliagura to baunsagar (od 5) and baunsagar to baraja of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha

Independent engineer services during operation n maintenance period for 6 laning of kaliagura to baunsagar (od 5) and baunsagar to baraja of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha

Read more
Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km

Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km

Read more
Development of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).

Development of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).

Read more
Develop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km

Develop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km

Read more
Independent engineer services during operation n maintenance period for 6 laning of baraja to kandili (od 7) and kandili to aluru (od 8) of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha

Independent engineer services during operation n maintenance period for 6 laning of baraja to kandili (od 7) and kandili to aluru (od 8) of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Development of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)

Development of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise