Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Independent Engineer For 4 Laning Of Muzaffarpur Sitamarhi Sonbarsa Section Of Nh 22 (Design Ch. Km. 0.000 To Design Ch. Km. 82.551 Total Length 82.551 Km) In The State Of Bihar On Hybrid Annuity Mode (Ham) (2nd Call)
|
| Description |
Consultancy Services For Independent Engineer For 4 Laning Of Muzaffarpur Sitamarhi Sonbarsa Section Of Nh 22 (Design Ch. Km. 0.000 To Design Ch. Km. 82.551 Total Length 82.551 Km) In The State Of Bihar On Hybrid Annuity Mode (Ham) (2nd Call)
|
| Organisation | National Highways Authority of India | Head Office - NHAI | Technical - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 5000 |
| EMD | 10 Lakh |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | July 02, 2026 14:30 |
| End Date |
Open
22/10/2026
7 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreSix-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Read moreIndependent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Independent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Read moreIndependent engineer services during operation n maintenance period for 6 laning of kaliagura to baunsagar (od 5) and baunsagar to baraja of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha
Independent engineer services during operation n maintenance period for 6 laning of kaliagura to baunsagar (od 5) and baunsagar to baraja of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha
Read moreDevelopment of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km
Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km
Read moreDevelopment of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).
Development of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).
Read moreDevelop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km
Develop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km
Read moreIndependent engineer services during operation n maintenance period for 6 laning of baraja to kandili (od 7) and kandili to aluru (od 8) of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha
Independent engineer services during operation n maintenance period for 6 laning of baraja to kandili (od 7) and kandili to aluru (od 8) of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreDevelopment of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)
Development of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)
Read moreof your Industry type