Tender Details

Particulars Details
Title
4 Laning Of Muzaffarpur Sitamarhi Sonbarsa Section Of Nh 22 (Design Ch. Km. 0.000 To Design Ch. Km. 82.551 Total Length 82.551 Km) In The State Of Bihar On Hybrid Annuity Mode (Ham)
Description
4 Laning Of Muzaffarpur Sitamarhi Sonbarsa Section Of Nh 22 (Design Ch. Km. 0.000 To Design Ch. Km. 82.551 Total Length 82.551 Km) In The State Of Bihar On Hybrid Annuity Mode (Ham)
Organisation National Highways Authority of India | Head Office - NHAI | Technical - NHAI
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 2.5 Lakh
EMD 24.41 Crore
Tender Value 2441.07 Crore
Place
Link Login to view
Start Date January 07, 2026 23:00
End Date
Open 22/10/2026

9 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Read more
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode

Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode

Read more
Chambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25

Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi

4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi

Read more
Metal beam crash barrier mbcb work for four laning of dhangaon to boregaon section of nh347bg and nh753l from km 81.000 to 139.000 design length 58 km under bharatmala pariyojana in the state of madhya pradesh on hybrid annuity mode

Metal beam crash barrier mbcb work for four laning of dhangaon to boregaon section of nh347bg and nh753l from km 81.000 to 139.000 design length 58 km under bharatmala pariyojana in the state of madhya pradesh on hybrid annuity mode

Read more
Consultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.

Consultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.

Read more
Devel. of 6l ac gf regional expressway on northern side of hyderabad from girmapur vill ch1.518 to pragnapur ch.82.000 for a design length of 83.518 km in telangana under nh o on hybrid annuity mode pkg i

Devel. of 6l ac gf regional expressway on northern side of hyderabad from girmapur vill ch1.518 to pragnapur ch.82.000 for a design length of 83.518 km in telangana under nh o on hybrid annuity mode pkg i

Read more
Construction of breakwater, rock bund, wharf and capital dredging and reclamation for backup yard and allied onshore facilities including maintenance thereof on hybrid annuity model (ham) under development of outer harbour at v.o. chidambaranar port.

Construction of breakwater, rock bund, wharf and capital dredging and reclamation for backup yard and allied onshore facilities including maintenance thereof on hybrid annuity model (ham) under development of outer harbour at v.o. chidambaranar port.

Read more
Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km

Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise