Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rfp For Construction Of Gonda Bypass (Western Part) Of Nh 330 B To Four Lane With Paved Shoulder Configuration Design Length Of 20.570 Km Under Hybrid Annuity Mode (Ham) In The State Of Uttar Pradesh
|
| Description |
Rfp For Construction Of Gonda Bypass (Western Part) Of Nh 330 B To Four Lane With Paved Shoulder Configuration Design Length Of 20.570 Km Under Hybrid Annuity Mode (Ham) In The State Of Uttar Pradesh
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 90000 |
| EMD | 8.76 Crore |
| Tender Value | |
| Place | GONDA |
| Link | Login to view |
| Start Date | June 17, 2026 00:25 |
| End Date |
Open
31/07/2026
40 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreRfp for construction of deoria bypass from existing km. 27.140 to existing km. 46.780 (design km. 49.109) on nh727a (design length 21.969 km.) to four lane with paved shoulder configuration under hybrid annuity mode (ham) in the state of up.
Rfp for construction of deoria bypass from existing km. 27.140 to existing km. 46.780 (design km. 49.109) on nh727a (design length 21.969 km.) to four lane with paved shoulder configuration under hybrid annuity mode (ham) in the state of up.
Read moreRfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.
Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.
Read moreIndependent engineer services for construction of salempur bypass to four lane with paved shoulder configuration from km 64.000 of nh-727a to km 61.500 of nh-727b ,design length of 14.700 km under hybrid annuity mode (ham) in the state of up
Independent engineer services for construction of salempur bypass to four lane with paved shoulder configuration from km 64.000 of nh-727a to km 61.500 of nh-727b ,design length of 14.700 km under hybrid annuity mode (ham) in the state of up
Read moreUpgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).
Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).
Read moreConstruction of basti ring road (phase-i) with four lane configuration (design length 22.150 km) for basti city in the state of uttar pradesh on hybrid annuity mode.
Construction of basti ring road (phase-i) with four lane configuration (design length 22.150 km) for basti city in the state of uttar pradesh on hybrid annuity mode.
Read moreConstruction of rewa bypass as 4-lane with paved shoulder along with service road s from the ratahara chowk to chorhata chowk road section of nh-30 design length 19.20 km in the state of madhya pradesh on hybrid annuity mode (ham)
Construction of rewa bypass as 4-lane with paved shoulder along with service road s from the ratahara chowk to chorhata chowk road section of nh-30 design length 19.20 km in the state of madhya pradesh on hybrid annuity mode (ham)
Read moreConstruction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode
Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode
Read moreof your Industry type