Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Independent Engineer Services For Supervision Of (I) 4 Laning Of Existing 2 Lane Galgalia Bahadurganj Section From Design Ch. 0.000 To Design Ch. 49.000 (Ii) 4 Laning Of Existing 2 Lane Bahadurganj Araria Section Design Ch. 49.000 T
|
| Description |
Independent Engineer Services For Supervision Of (I) 4 Laning Of Existing 2 Lane Galgalia Bahadurganj Section From Design Ch. 0.000 To Design Ch. 49.000 (Ii) 4 Laning Of Existing 2 Lane Bahadurganj Araria Section Design Ch. 49.000 T
|
| Organisation | National Highways Authority of India | RO-Patna - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 5000 |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 15, 2026 20:00 |
| End Date |
Open
26/11/2026
41 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreCs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Cs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreSix-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Read moreWidening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Read moreUpgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Read moreIndependent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Independent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Read moreConstruction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Read moreConstruction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km in kerala on bot mode
Construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km in kerala on bot mode
Read moreWidening of existing 2 laning stretch road in available width for safety drainage segregation of traffic in phaltan city start ch. 138 250 at bypass start point to end ch. 144 425 and construction new rob at km 179 730 existing km 61 100 of nh 965
Widening of existing 2 laning stretch road in available width for safety drainage segregation of traffic in phaltan city start ch. 138 250 at bypass start point to end ch. 144 425 and construction new rob at km 179 730 existing km 61 100 of nh 965
Read moreof your Industry type