Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Four Lane Access Control Arwal Bypass From Km 54.200 To Km 66.500 (Design Ch. 67.680) Of Existing Nh 139 On Naubatpur Hariharganj Road In The State Of Bihar Under Epc Mode.
|
| Description |
Construction Of Four Lane Access Control Arwal Bypass From Km 54.200 To Km 66.500 (Design Ch. 67.680) Of Existing Nh 139 On Naubatpur Hariharganj Road In The State Of Bihar Under Epc Mode.
|
| Organisation | Ministry of Road Transport and Highways | P3 Delhi - MoRTH | RO Patna - MoRTH |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 35400 |
| EMD | 2.7 Crore |
| Tender Value | 269.53 Crore |
| Place | |
| Link | Login to view |
| Start Date | July 30, 2026 22:30 |
| End Date |
Open
19/11/2026
36 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Read moreConstruction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Read moreAe services for development of access controlled highway of 4 lane from kadur (km 256.160) to hasnapur/potulamadugu (km 267.360) (mahabubnagar bypass) of hyderabad panaji section of nh167 (length 11.200km) under nh(o) in telangana on epc mode.
Ae services for development of access controlled highway of 4 lane from kadur (km 256.160) to hasnapur/potulamadugu (km 267.360) (mahabubnagar bypass) of hyderabad panaji section of nh167 (length 11.200km) under nh(o) in telangana on epc mode.
Read moreUpgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
Upgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
Read moreConstruction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 75.150 of new nh38 and ending at design km 88.030 of new nh38 (design length 22.710km) in the state of tamil nadu on epc mode
Construction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 75.150 of new nh38 and ending at design km 88.030 of new nh38 (design length 22.710km) in the state of tamil nadu on epc mode
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreUpgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Read moreConstruction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Construction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Read moreof your Industry type