Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Pcc Road At Banpur, Ward No 02 From House Of Bindu Ram To Tihara More, Karkat, Siwana
|
Description |
Construction Of Pcc Road At Banpur, Ward No 02 From House Of Bindu Ram To Tihara More, Karkat, Siwana
|
Organisation | UDD Secretary | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 3.47 Lakh |
Tender Value | |
Place | WARD NO. 2 |
Link |
AAAAAAAAAA Login to view |
Start Date | May 08, 2025 15:30 |
End Date |
27/05/2025 ( 17 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreIt addl. pune infotech park i industrial
Construction of 6 lane road using cement&#x0d concrete treatment with footpath and storm water pipeline&#x0d repairing and providing new curbing at center verge and&#x0d road furnitures from shivaji chowk to smashan bhumi&#x0d
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreWbphed/02/bwn of se/cc of 2025-2026 sl.no.4
Different works related sinking of additionaltube-wells interconnection fhtcs construction of pump house boundary wall protection works approach road etc. with 09 nos.pwss of manteswer block of durgapur sub divn under burdwan divn phe dte.&#x0d &#x0d &#x0d
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreof your Industry type