Tender Details
Particulars | Details |
---|---|
Title |
Rectification Of Blackspot Through Long Term Measures By Construction Of 3 Lane Unidirectional Vup With Service Road Near Roladungri At Km 326.570 (Black Spot Id Gj 02 129) On Nh 48 In The State Of Gujarat On Epc Mode
|
Description |
Rectification Of Blackspot Through Long Term Measures By Construction Of 3 Lane Unidirectional Vup With Service Road Near Roladungri At Km 326.570 (Black Spot Id Gj 02 129) On Nh 48 In The State Of Gujarat On Epc Mode
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 21.73 Lakh |
Tender Value | |
Place | NHAI, Regional Office Gandhinagar |
Link |
AAAAAAAAAA Login to view |
Start Date | May 09, 2025 00:00 |
End Date |
25/06/2025 ( 27 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read morePermanent rectification of black spot (id no. cg-(03)-07) at pairi river approach-loharapta bridge gariyaband side from km.59.400 to km.60.100 of nh-130c on sbd mode in the state of chhattisgarh.
Permanent rectification of black spot (id no. cg-(03)-07) at pairi river approach-loharapta bridge gariyaband side from km.59.400 to km.60.100 of nh-130c on sbd mode in the state of chhattisgarh.
Read moreConstruction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Read moreConsultancy services for preparation of detailed project report to widening from 2lane to 4lane of reach from km 1/5 to 3/7 under long term rectification of black spots (id tg-02-205 and tg-05-181)on khammam -aswaraopeta section of nh365bb (2nd call)
Consultancy services for preparation of detailed project report to widening from 2lane to 4lane of reach from km 1/5 to 3/7 under long term rectification of black spots (id tg-02-205 and tg-05-181)on khammam -aswaraopeta section of nh365bb (2nd cal
Read moreGeneral road safety long term measure 2021 rectification of black spot identified by natpac at kavumbhagom stretch in pathanamthitta district general civil work.
General road safety long term measure 2021 rectification of black spot identified by natpac at kavumbhagom stretch in pathanamthitta district general civil work.
Read moreConstruction of a 6-lane vup at morth identified blackspot (ld up-03-213) at km 197.115 (dhamora bypass ing point) on nh-530 in the state of uttar pradesh on epc mode
Construction of a 6-lane vup at morth identified blackspot (ld up-03-213) at km 197.115 (dhamora bypass ing point) on nh-530 in the state of uttar pradesh on epc mode
Read moreConst. of ec for gammon junc at km. 903.265 (blackspot id no. ap(05)-092)and diwancheruvu junc at km. 902.308(blackspot id no.ap(03)-299) on nh16 in andhra pradesh under nh(o) on epc mode
Const. of ec for gammon junc at km. 903.265 (blackspot id no. ap(05)-092)and diwancheruvu junc at km. 902.308(blackspot id no.ap(03)-299) on nh16 in andhra pradesh under nh(o) on epc mode
Read moreConsultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode
Consultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode
Read moreof your Industry type