Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🔧 Electrical Renovation Project At Fci Fsd & Do Baroda 🏭💡 The Food Corporation Of India, Under The Central Government's Ministry/Department, Is Seeking Bids For The Renovation And Modification Of The Depot Office Building At Fsd And Do Baroda. This Project Includes Upgrading The Internal And External Lighting Arrangements Of The Mini Godowns, The Main Gate, And Service Connections. 📅 Bid Submission Deadline: April 25, 2024, 3:00 Pm A Tender Fee Of Inr 32,675 Is Applicable As Emd. Interested Contractors Should Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, To Meet The Project's Objectives And Adhere To The Stipulated Quality Standards. Keywords: Renovation, Electrical Works, Fci Fsd & Do Baroda, Government Tender, Depot Office Building, Mini Godowns, Main Gate, Service Connection, Tender Fee, Emd| Particulars | Details |
|---|---|
| Title |
Chambal Alwar Bharatpur Water Supply Project Package 2 Based On Hybrid Annuity Model Ace(p) Bharatpur Nit No. 05 / 2024 25
|
| Description |
Work Of Construction Of Intermediate Cwph At Kotra Baseri Laying Of Clear Water Transmission Main From Kotra To Naroli Nadbai Via Junction 2 At Naroli Ips Nadbai Nagar Ramgarh Kishangarhbas Tijara Jairoli And Bhiwadi Based On Ham Model Under Jjm
|
| Organisation | PHED-Chief Engineer(SP and EAP), Jaipur | State Govt. and UT |
| Tender Id | 2024_FCI_803793_1 |
|
Reference Number |
05/2024-25 |
| Tender Fee | 1.21 Lakh |
| EMD | 47.73 Crore |
| Tender Value | |
| Place | Dholpur Bharatpur and Alwar |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=835611 |
| Start Date | May 08, 2025 23:30 |
| End Date |
Expired
08/09/2025
Expired 294 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Chambal alwar bharatpur water supply project package 1 based on hybrid annuity model ace(p) bharatpur nit no. 04 / 2024-25
Work for construction of intake well inside chambal river including approach bridge construction of rwr including all works required for inlet inside rwr outlet system from rwr to outlet chamber wtp cwr rwph and allied works package 1 under jjm
Read moreKaliteer water supply project based on hybird annuity model (ham) ace (p) bharatpur nit no.03/2024-25
Work for construction of water treatment plants cwrs and cwphs near wtps clear water transmission main from wtp various ipss laying of rising mains to different esrs construction of esrs distribution system in villages providing fhtcs including
Read moreDevelopment of 60 mld sea water desalination plant at village mullakadu in tuticorin district tamilnadu on hybrid annuity model (ham), ppp basis
Development of 60 mld sea water desalination plant at village mullakadu in tuticorin district tamilnadu on hybrid annuity model (ham), ppp basis
Read moreNit no. 02(2024-25)ace(m)-9 item no_1
Strengthening and improvement of water supply system in dabri ward in dwarka constituency under ee-(m-33).
Read moreSegregation of 11 kv mixed feeders, spv plant including onm on hybrid annuity model and network management for 10 years under tn-dsm-25 of chittorgarh circle lot-2
Segregation of 11 kv mixed feeders, spv plant including onm on hybrid annuity model and network management of 33/11 kv s/s and downstream network for 10 years under tn-dsm-25 of chittorgarh circle lot-2
Read more4 or 6 laning of edathanattukara to karakkunnu section of nh966 from km. 61.440 to km. 87.930 (package 3) in the state of kerala on hybrid annuity mode
4 or 6 laning of edathanattukara to karakkunnu section of nh966 from km. 61.440 to km. 87.930 (package 3) in the state of kerala on hybrid annuity mode
Read moreDevelopment, operation and maintenance of ropeway between tawang monastery to p t tso lake in tawang district in the state of arunachal pradesh on hybrid annuity mode.
Development, operation and maintenance of
 ropeway between tawang monastery to p t
 tso lake in tawang district in the state of
 arunachal pradesh on hybrid annuity mode.
Read moreNit no. 05/ggp /24-25 sl no.3
Grey water management project (vertical filter chember and silt chember) under pathchhara gopalpur sbm village under gopalpur gp within mathabhanga -i block&#x0d 6 nos unit
Read moreWidening, reconstruction and up-gradation to 2 lps configuration for the work of junnar ghodegaon - taleghar road (nh-61 spur) in the state of maharashtra on hybrid annuity mode.
Widening, reconstruction and up-gradation to 2 lps configuration for the work of junnar ghodegaon - taleghar road (nh-61 spur) in the state of maharashtra on hybrid annuity mode.
Read morePublic health circle, rajamahendravaram amrut 2.0 package i execution of 18 nos of water supply, sewage septage management and water body rejuvenation works including operations and maintenance in 7 urban local bos of east godavari, west godavari districts in concessionaire hybrid annuity model (cham).
Public health circle, rajamahendravaram amrut 2.0 package i execution of 18 nos of water supply, sewage septage management and water body rejuvenation works including operations and maintenance in 7 urban local bos of east godavari, west godavari districts in concessionaire hybrid annuity model (cham).
Read moreof your Industry type