Tender Details

Particulars Details
Title
Kaliteer Water Supply Project Based On Hybird Annuity Model (Ham) Ace (P) Bharatpur Nit No.03/2024 25
Description
Work For Construction Of Water Treatment Plants Cw Rs And Cwp Hs Near Wt Ps Clear Water Transmission Main From Wtp Various Ip Ss Laying Of Rising Mains To Different Es Rs Construction Of Es Rs Distribution System In Villages Providing Fht Cs Including
Organisation PHED-Chief Engineer(SP and EAP), Jaipur | ACE (Proj.) Bharathpur
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 1.18 Lakh
EMD 12.14 Crore
Tender Value 606.79 Crore
Place Rajasthan
Link Login to view
Start Date April 03, 2025 23:30
End Date
Open 10/12/2026

58 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Chambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25

Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm

Read more
Chambal alwar bharatpur water supply project package 1 based on hybrid annuity model ace(p) bharatpur nit no. 04 / 2024-25

Work for construction of intake well inside chambal river including approach bridge construction of rwr including all works required for inlet inside rwr outlet system from rwr to outlet chamber wtp cwr rwph and allied works package 1 under jjm

Read more
Chambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25

Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm

Read more
Construction of breakwater, rock bund, wharf and capital dredging and reclamation for backup yard and allied onshore facilities including maintenance thereof on hybrid annuity model (ham) under development of outer harbour at v.o. chidambaranar port.

Construction of breakwater, rock bund, wharf and capital dredging and reclamation for backup yard and allied onshore facilities including maintenance thereof on hybrid annuity model (ham) under development of outer harbour at v.o. chidambaranar port.

Read more
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Sewerage projects in 27 ulbs under sbm 2.0 under jurisdiction of nalgonda and khammam ph divisions (package-ii) under ls contract system with hybrid annuity model

Sewerage projects in 27 ulbs under sbm 2.0 under jurisdiction of nalgonda and khammam ph divisions (package-ii) under ls contract system with hybrid annuity model

Read more
Development of a 1 mld water treatment plant on the deval talao and campus dug well source and associated infrastructure at seepz sez mumbai on hybrid annuity model

Development of a 1 mld water treatment plant on the deval talao and campus dug well source and associated infrastructure at seepz sez mumbai on hybrid annuity model

Read more
Sewerage projects in 30 ulbs under sbm 2.0 under the jurisdiction of adilabad, karimnagar and warangal ph divisions (package-i) under ls contract system with hybrid annuity model

Sewerage projects in 30 ulbs under sbm 2.0 under the jurisdiction of adilabad, karimnagar and warangal ph divisions (package-i) under ls contract system with hybrid annuity model

Read more
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise