Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction On Epc Mode Of Greenfield Alignment To Nhdl Specifications With Paved Shoulders From Naku Of Design Km 0.00 To Nakula Of Design Km 9.130 Of Total Design Length 9.130 Km On Road Chungthang Lachen Monastry Log Bridge Muguthang Naku Section
|
| Description |
Construction On Epc Mode Of Greenfield Alignment To Nhdl Specifications With Paved Shoulders From Naku Of Design Km 0.00 To Nakula Of Design Km 9.130 Of Total Design Length 9.130 Km On Road Chungthang Lachen Monastry Log Bridge Muguthang Naku Section
|
| Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
| Tender Id | 2025_BRO_707049_1 |
|
Reference Number |
CE(P)SWTK/02/2025-26/EPC |
| Tender Fee | 20000 |
| EMD | 2.15 Crore |
| Tender Value | - |
| Place | On Road Naku to Nakula Km 0.00 to Km 9.130 |
| Link |
View Original Tender Notice
https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=791967 |
| Start Date | June 09, 2025 22:30 |
| End Date |
Expired
24/06/2025
Expired 459 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Constr on epc mode of greenfield alignment to nhdl specn with paved shoulders from naku km 0.000 to nakula km 9.130 of total design length 9.130 km on road chungthang-lachen monastry log bridge muguthang naku section part of nh 310 ag in the state o
Constr on epc mode of greenfield alignment to nhdl specn with paved shoulders from naku km 0.000 to nakula km 9.130 of total design length 9.130 km on road chungthang-lachen monastry log bridge muguthang naku section part of nh 310 ag in the state o
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreDesign and construction of 110.00 m span major pmt steel super structure bridge (through type) on open foundation over lachen river at km 1.824 including ssi on road chungthang bypass under pkg-ii nhdl works under 86 rcc/758 brtf /project swastik in
Design and construction of 110.00 m span major pmt steel super structure bridge (through type) on open foundation over lachen river at km 1.824 including ssi on road chungthang bypass under pkg-ii nhdl works under 86 rcc/758 brtf /project swastik in
Read moreSupply and stacking of crushed stone aggregates of sizes 6 pt 7 mm at km 24 pt 75 hmp site on lachen kalep road for bc 40 mm including correction work for resurfacing works 2025 26 on road chungthang lachen from km 19 pt 700 to km 27 pt 800 under 86
Supply and stacking of crushed stone aggregates of sizes 6 pt 7 mm at km 24 pt 75 hmp site on lachen kalep road for bc 40 mm including correction work for resurfacing works 2025 26 on road chungthang lachen from km 19 pt 700 to km 27 pt 800 under 86
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreConstruction improvement of rishi rongli kupup road from cl 9 to nhdl specifications through epc mode between existing km 53.00 design km 55.440 to existing km 70.00 design km 74.575 net design length 19.135 km under 130 rcc 764 brtf under project
Construction improvement of rishi rongli kupup road from cl 9 to nhdl specifications through epc mode between existing km 53.00 design km 55.440 to existing km 70.00 design km 74.575 net design length 19.135 km under 130 rcc 764 brtf under project
Read moreExecution of surfacing work for providing, laying and compaction of wmm 100 mm thick and 75 mm thick as per guidelines of morth specifications between km 2.50 to km 7.00 on chungthang-lachen road under 86 rcc /758 brtf/project swastik
Execution of surfacing work for providing, laying and compaction of wmm 100 mm thick and 75 mm thick as per guidelines of morth specifications between km 2.50 to km 7.00 on chungthang-lachen road under 86 rcc /758 brtf/project swastik
Read moreExecution of surfacing work for providing, laying and compaction of (wmm) 100 mm thick and 75 mm thick as per guidelines of morth specifications bet km 7.00 to km 10.00 and bet km 17.00-km 20.00 on chungthang-lachen road under 86 rcc/758 brtf/project
Execution of surfacing work for providing, laying and compaction of (wmm) 100 mm thick and 75 mm thick as per guidelines of morth specifications bet km 7.00 to km 10.00 and bet km 17.00-km 20.00 on chungthang-lachen road under 86 rcc/758 brtf/project
Read moreConstr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Constr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Read moreExecution of surfacing work of wmm100 mm one layer and 75 mm two layer as per guidelines of morth specifications for road and bridge works between km 7.00 to km 10.00 and between km 17.00 to km 20.00 on chungthang-lachen road under 86 rcc /758 brtf/p
Execution of surfacing work of wmm100 mm one layer and 75 mm two layer as per guidelines of morth specifications for road and bridge works between km 7.00 to km 10.00 and between km 17.00 to km 20.00 on chungthang-lachen road under 86 rcc /758 brtf/p
Read moreof your Industry type